1 / 7

Bay Area Regional Express Lane Network

Bay Area Regional Express Lane Network. Public Infrastructure Advisory Commission December 16, 2010. Backbone Concept. B A Y A R E A R E G I O N AL E X P R E S S L A N E N E T W O R K. 2. 460 directional miles Emphasizes operational benefits, cost feasibility

thimba
Télécharger la présentation

Bay Area Regional Express Lane Network

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Bay Area Regional Express Lane Network Public Infrastructure Advisory Commission December 16, 2010

  2. Backbone Concept B A Y A R E A R E G I O N AL E X P R E S S L A N E N E T W O R K 2 • 460 directional miles • Emphasizes operational benefits, cost feasibility • Provides strong north-south connectivity 2

  3. B A Y A R E A R E G I O N AL E X P R E S S L A N E N E T W O R K Options Under Existing Law • Until December 31, 2011, CTC can grant authority to MTC for 2 express lane “facilities” (including conversions) in Northern California AB 1467 (Torrico, 2006) as amended by AB 798 (Nava, 2009) • California Transportation Financing Authority can give MTC authority to bond finance express lanes and implement them AB 798 (Nava, 2009) • CTC can authorize MTC P3 SB 4 (Codgill, 2009) • Already authorized express lanes could become part of the network through negotiated agreements among willing partners M E T R O P O L I T A N T R A N S P O R T A T I O N C O M M I S S I O N

  4. B A Y A R E A R E G I O N AL E X P R E S S L A N E N E T W O R K Current Approach Through Summer 2011 • Seek authorization from the CTC under AB 1467 for the Backbone. • Review project delivery and financing options including design/build, P3 and public financing options. • Continue to work with Caltrans to enable “realistic delivery” design approach.

  5. Initial Express Lanes Projects       B A Y A R E A R E G I O N AL E X P R E S S L A N E N E T W O R K 5 M E T R O P O L I T A N T R A N S P O R T A T I O N C O M M I S S I O N 5

  6. B A Y A R E A R E G I O N AL E X P R E S S L A N E N E T W O R K I-680 Express Lane • Opened September 20 • AM peak period toll has ranged from $1.00 to a high of $2.50 • Some back-up north of initial entry point; decreasing daily 6

  7. B A Y A R E A R E G I O N AL E X P R E S S L A N E N E T W O R K Timeline

More Related