RA-2/MWR ESLs Readiness Review

RA-2/MWR ESLs Readiness Review. ESLs/IPF interface CLS status MSSL status ESLs input to Level 2 algorithms verification group Evolutions and updates mechanism. ESLs/IPF interface. June 2001: new end to end TDS produced by Level 1b/2 ESLs (ALS/CLS/MSSL):

thora
Télécharger la présentation

RA-2/MWR ESLs Readiness Review

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RA-2/MWR ESLs Readiness Review • ESLs/IPF interface • CLS status • MSSL status • ESLs input to Level 2 algorithms verification group • Evolutions and updates mechanism

  2. ESLs/IPF interface • June 2001: new end to end TDS produced by Level 1b/2 ESLs (ALS/CLS/MSSL): • the IPF is currently analysing this TDS: SPRs have been generated by the IPF on the Level 2 TDS and closed either: • with the output of the reference processors debugging process (IPF problem) • or with a modification on the Level 2 TDS (code) or documentation (DPMs/IODDs) • Upgrade of ESLs reference processors in progress: • new algorithms and auxiliary files under implementation in the ref. processors

  3. ESLs/IPF interface • corresponding upgrade of the IPF/F-PAC • verification of the modifications by using a new level 2 TDS to be produced by the ESLs

  4. CLS status • Progress meeting held on 21st August at CLS: • upgrade of LOP code in progress: • MWR algorithms (wet tropo correction, water vapour and cloud liquid water contents, and atmospheric attenuation corrections) • ocean tide solution 1 • geoid/mss interpolation routines • off-nadir angles • upgrade of LOP auxiliary files and models: • RA2_SOI_AX (MWR coeffs, rain table, mss/geo interpolation window sizes, ocean tide sol. 1 coeffs) • RA2_OT1_AX from GOT99 (0.5 deg) • RA2_OT2_AX/RA2_TLD_AX from FES99 (0.25 deg)

  5. CLS status • MWR_LSF_AX: better resolution (from 1/12 to 1/30 of deg) • RA2_MSS_AX from GSFC00 (from 1/16 to 1/30 of deg) • new Level 2 TDS to be produced with: • modifications from new algorithms/aux. files implemented • eventual modifications deriving from SPRs raised by the IPF on the current TDS

  6. MSSL status • New final slope models (Greenland and Antarctica) delivered: • tested by the IPF • new Level 2 TDS to be produced with: • modifications from new algorithms/aux. files implemented • eventual modifications deriving from IPF SPRs

  7. Level 2 algorithms verification activities • Classification of algorithms: • algorithms also used in other missions (i.e. model iono correction, steady heights, ocean tides) • only precision and impact on the output parameters will be verified • new algorithms (e.g. ocean/ice2 retrackings, wind speed, dual freq iono correction) • extensive verification needed • Quantity of data used • small sets of data (1 or 2 orbits) to examine most of the output parameters • larger sets of data (between 7 days and 1 cycle) to perform statistical analysis, fine tuning, precision, …

  8. Level 2 algorithms verification activities • Type of data used: • FDGDR/FDMAR (IPF) and IGDR/IMAR, GDR and SGDR (F-PAC) • Products validation • Verification of the MPH and SPH (e.g. consistency of the information in the headers and in the records) • verification of MDS parameters not verified in the first stages • in parallel validation tasks for R. Scharroo and D. Cotton • Detailed analysis of each algorithm verification strategy to be done at the next L2 algos verif. group meeting (13/09/01)

  9. Evolutions and updates mechanisms • Necessity of upgrade aux. files and algos near the end of CP may arise, following the work done by cal/val teams. • Requirement to upgrade aux. files/algos to be triggered by sub-group leaders (RA2 L1b, RA2 L2 and MWR): • ESLs to write SPR on applicable DPM, to validate it on a prototype processor (copy of the ref. processor) and to produce TDS (to test evolution on IPF/F-PAC) that will be delivered to the CCVT coordinator. • If deliverables acceptable, they’ll be passed to ESA/Alcatel interface for IPF and to ESA interface for F-PAC, for implementation • Time scale very short, since this evolution has to be done before the end of CP