1 / 7

SLB Synchronization in H4 Beam (LIP - Lisbon)

TT. 56. 60. 64. 55 (  ). 59. 63 (  ). 54 (  ). 58 (  ). 62 (  ). SLB Synchronization in H4 Beam (LIP - Lisbon). SPS beam intensity histogram. SLB bunch crossing occupancy histogram. Validated!. Trigger in MTCC. Major success!

thora
Télécharger la présentation

SLB Synchronization in H4 Beam (LIP - Lisbon)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. TT 56 60 64 55 () 59 63 () 54 () 58 () 62 () SLB Synchronization in H4 Beam(LIP - Lisbon) SPS beam intensity histogram SLB bunch crossing occupancy histogram Validated!

  2. Trigger in MTCC • Major success! • 25 million events at a trigger rate of ~ 200 Hz • Mixture of DT, CSC, RBC, RPC-TB, HCAL-RCT trigs. • Trigger requirements easily configurable • Stable operation • Stable run uptime > 1 hr many runs > 500K L1A. • All subsystems synchronized • Tracker, ECAL, HCAL*, RPC*, DT*, CSC* • Readout & Trigger* • Trig. throttling worked • Even when trigger problems or noise > 1 kHz • Impressive teamwork!

  3. Results from MTCC Phase 2 • HCAL-RCT Trigger in time w/DT Drift Tube Trigger vs. Calorimeter Trigger time in 25 ns bunch crossings (coincidence = 0 bx)

  4. Selected MTTC Muon Trigger Results:Extrapolation of DT to CSC Validated! & Relative CSC  DT timing checked

  5. Event display of DT & RPC

  6. Trigger Installation in USC55 • Regional Calorimeter Trigger: • 18 crates RCT Crates installed in 10 Racks • 10 crates have all tested cards installed • 6 Global Cal. Trig. Crates also installed • Cables connected to ECAL, HCAL, GCT • Most other trigger systems have crates & cards installed • Integration “pattern tests” underway

  7. Leaf Card Leaf Card Source Card Source Card Source Card Source Card Source Card Source Card Source Card Source Card Source Card Source Card Concentrator Card Global Calorimeter Trigger:First Phase Trigger installed in USC55 Wheel Concentrator Wheel 3 Jets Leafs e/ Leafs 3 Jets Leafs GTI • 18/63 Source cards • 1/8 Leaf cards • 0/2 Wheel cards • Proto/1 Concentrator 31 Source Cards 32 Source Cards

More Related