1 / 4

GIF++ The new Gamma Irradiation Facility at CERN

GIF++ The new Gamma Irradiation Facility at CERN. Physics Department. Detector Technology Group. Commissionning 30 Sep 2014. 3 leading firms agreed to bid 3 countries are represented 3 bids were received. June 13 th 2013. May 17 th 2013. MS-3914/PH 18/Sep./2012. GIF++

tibor
Télécharger la présentation

GIF++ The new Gamma Irradiation Facility at CERN

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GIF++ The new Gamma Irradiation Facility at CERN PhysicsDepartment Detector TechnologyGroup Commissionning 30 Sep 2014 3 leadingfirmsagreed to bid 3 countries are represented 3 bidswerereceived June 13th 2013 May 17th 2013 MS-3914/PH 18/Sep./2012 R. Fortin PH-DT-DD

  2. GIF++ The new Gamma Irradiation Facility at CERN PhysicsDepartment Detector TechnologyGroup • Our 3 biddersoffered: • 137Cs source of 16,6TBq (450Ci) • A maximum source uncertainty of +/-20% • Encapsulation of the isotope whereheight≈ diameter(type R6060) • Vertical travel of the source carrier betweenSafe and Unsafe positions • Emergency return to SAFE position is possible by Gravityalone • Back to back front and rearcollimatorspositioned 1,5m above the floor • Parallelipipedic design of collimatorouter surfaces • Timercontrolledshutter for the (parasitic) rearcollimator • Fixation for a rearcollimation windowrestrictor • +/- 37° collimation angles everywhere • Fixation for both front and rearfield correction filters • Compliance to CERN Access Control, GIF Control System and 100m cables • Dismantling of BA102 immediatelyafterCommissioning(ADR7 isexpensive) • An optional 10 yearswarranty R. Fortin PH-DT-DD

  3. GIF++ The new Gamma Irradiation Facility at CERN PhysicsDepartment Detector TechnologyGroup • Remainingtechnicalsubtletiesthatneedbeagreedupon: • Twocompanies propose pneumatic actuation of the source carrier • One offers stepper motors • Twocompanies support their lead castle on a square stand • One offers a stool • Twocompaniesoffer a complete programmable attenuatorpackage • One does not • Twocompaniescommit to dismantlethe new GIF++ irradiatorafter 10 years • One will not • BUT ALL THREE BIDDERS OFFER ADEQUATE EQUIPMENT! R. Fortin PH-DT-DD

  4. GIF++ The new Gamma Irradiation Facility at CERN PhysicsDepartment Detector TechnologyGroup What’smissingtoday: These 3 offerswereissuedassuming CERN canpurchaseits GIF++ Irradiatordirectlywithoutapplying for anyadditionalauthorizationotherthan the ADR7. Is there a show stopper down the road ? R. Fortin PH-DT-DD

More Related