1 / 18

Status of day-one experiment commissioning at COSY

Goa, Mar. 11-15 2013. Status of day-one experiment commissioning at COSY. Huagen Xu. Goals of day-one experiment at HESR. Day-one location. Pbarp elastic scattering Coincidence (forward&recoil) Large range of t : 0.0008-0.1 GeV 2. Cluster target at ANKE. Test method

tmona
Télécharger la présentation

Status of day-one experiment commissioning at COSY

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Goa, Mar. 11-15 2013 Status of day-one experiment commissioning at COSY Huagen Xu

  2. Goals of day-one experiment at HESR Day-one location • Pbarp elastic scattering • Coincidence (forward&recoil) • Large range of t : 0.0008-0.1 GeV2 Cluster target at ANKE • Test method • Recoil arm construction • Commissioning at COSY COSY

  3. Recoil Arm Top view • Si : 76.8 x 50 x 1 (mm) (1.2 mm pitch) • Ge: 80.4 x 50 x 5/11 (mm) (1.2mm pitch) Fixed plane for commissioning

  4. Part 1: Detectors • Achievements: • Test after rework for Si 2951-15 • To do: • Final assembly MICRON • Achievements: • High leakage current problem has been fixed • To do: • Test with new chamber • Final assembly

  5. Part 2: FEE Mesytec: MPR16: 16ch with variable gain MPR1: for rear side MSCF16: 16ch with LE timing output MADC32: peak sensing ADC, input range and bit resolution selectable Received: quantity MPR-16 12 / 12 MPR-1 5 / 5 MSCF-16 12 /12 MADC-32 6 / 6 • Achievements: • All new required modules received • To do: • Test with final setup

  6. Received: quantity • New NIM crate 2 To be received: quantity • Long cable set 14 • Achievements: • Crates, logic modules, NIM crates, racks are complete • Production of cables between detector and preamplifier are finished • To do: • Final assembly with long cable set

  7. Part 3 : DAQ and test system DAQ hardware: - VME crate - 6 MADC32 - 1 CAEN V785 DAQ software: - IRQ mode (under work) - Online display (realized) New test chamber with coldhead: - 5.0e-8 mbar after cooling - 42K reachable with test Ge detector • Achievements: • Hardware are completed • To do: • Code work for DAQ • Ge test with new test chamber

  8. Coldhead Preamplifiers Compressor Venting valve Vacuum gauge

  9. Part 4: Cluster target • The expected specification of existing cluster target at ANKE location has been verified by target operating group. • The relevant change of the cluster target will be done together with the installation of recoil arm. Proposal to use the ANKE cluster target has been accepted by ANKE collaboration! • Achievements: • New collimator has been prepared • To do: • Changing the collimator and test its spec afterwards

  10. Part 5: Detector chamber Existing target chamber • Achievements: • Chamber construction has been finished by week 8 at ZAT • To do: • Final assembly with detectors , Pt100 sensor as well as heater • Lab test for the complete setup

  11. Detector chamber has been constructed

  12. Side flange with cold plate

  13. Part 6: Cooling and Temperature controller • Cooling for test chamber • LN2 solution & coldhead • Cooling for experiment • Coldhead is working properly • Temperature controller • Lakeshore 336 controller is being tested and tuned. • Heating function is working properly with PID control Achievements: • 40 K reached with no load on coldhead • Temperature control with PID setting is working fine To do: • Operate coldhead with detector and temperature controller

  14. General Topics • Infrastructure at site (to be fixed in Oct. ) • Power supply (available) • Space to put FEE rack (fixed) • Space to put coldhead compressor (to be found in tunnel) • Cooling water for compressor (existing) • Ventilation status at site (Rack will be outside of tunnel) • Installation schedule • Target modification (after Week 16) • Day-one chamber installation (during Week 17-24) • Pumping time requested (not known yet) • Slow control system for day-1 setup • Pumps (integrated into COSY slow control system) • Beam time applied • On Week 30 and Week 39

  15. Thanks for your attention!

  16. Sketch of day-one experiment Large t-range (pbarp): 0.0008-0.1 GeV2 Starting with one recoil arm

  17. Performance evaluation with pure elastic events Setting for event generator(DPM): Plab : 6.2 GeV/c, pure elastic events Theta_min : 0.113°(~1.98mrad) Events : 5M Parameters : σel = 18.97mb, σtot = 64.50mb, b = 11.89(GeV/c)-2, ρ = - 0.063 t: [0.0002-0.03] lumi: ~ 0.39% PANDA The measurable t is limited to a small range!

More Related