Report @ CERN-KEK about LHC upgrades programs

Report @ CERN-KEK about LHC upgrades programs. Lucio Rossi 14 December 2011. The path and goals: 3000 fb -1 – L peak < 5 10 34. Rad. damage. Tuning of the goal after summer.

todd-moore
Télécharger la présentation

Report @ CERN-KEK about LHC upgrades programs

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Report @ CERN-KEK about LHC upgrades programs Lucio Rossi 14 December 2011

  2. The pathand goals: 3000 fb-1 – Lpeak< 5 1034 Rad.damage LRossi@CERN-KEK Dec2011

  3. Tuning of the goal aftersummer Efficiency is defined as the ratio between the annual luminosity target of 250 fb-1 over the potential luminosity that can be reached with an ideal cycle run time with no stop for 150 days: trun= tlev+tdec+tturn. The turnaround time after a beam dump is taken as 5 hours, tdecay is 3 h while tlev depends on the total beam current LRossi@CERN-KEK Dec2011

  4. Cycle in the HL-LHC run 20E+34 pile up heatdeposition in IR and DS other? Levelling LRossi@CERN-KEK Dec2011

  5. Possible evolutiontoward 3000 fb-1 LRossi@CERN-KEK Dec2011

  6. IR Magnets(triplet, D1, D2, MQ4, …) SC CrabCavities, IR Collimation LRossi@CERN-KEK Dec2011

  7. Other changes Cryogenics During LS2, a new refrigerator will be installed at P4, to feed RF cavities and restore IR 5L Refrigerator 6.5 kW @ 4.5 K: 4.5 kW + 0.25 kW (flash) + 0.12 kW (thermal losses line & valve box) + 1.6 kW (contingency 33%) During LS3 new refrigerators for P1-P5 Warm compressor installed in surface. Warm gas lines in Pit Cold boxes installed in underground and surface (if 2 K or 1.8 K options) Distribution and transfer lines to equipments (magnets, DFBs, crab-cavities ?, SCL ?, sector powering ?...) LRossi@CERN-KEK Dec2011

  8. Other changes (list not exhaustive…) R2E: whateverneeded, seefromexperience frome nextyears P8 Removal of EPC and DFBX from tunnel to surface via long SC links rated of 0.1-1 GW d.c. LRossi@CERN-KEK Dec2011

  9. LIU – LHC Inj Upgrade (R. Garoby)LS2 (2018) and LS3 (2012-23) • Linac4 (160 Mev H- vs. 50 MeV H of Linac2)Ready by mid 2014Connected 2015?Reliability, brilliance… • PS Booster upgrade:from 1.4 GeV (800 Gev)to 2 GeV to reducespaceahrgeat PS injectionIntensity gain : +65%Project launched; • SPS reduction of impedencenew opticswithlowt (2615 GeV)new 200 MHz cavitiesreductione-clouds by vaccumchambercoating (or scrubbing?) LRossi@CERN-KEK Dec2011

  10. The HL composition, largerthan FP7 HiLumi Matching section and correctors Collimation Project High Field Magnets R&D Beam Diagnostics HE-LHC Studies EuCARD2 WP10 on HTS dipoles Hardware Commissioning LRossi@CERN-KEK Dec2011

  11. Budget FP7 HiLumi and HL-LHC Perfect score 15/15, ALL request to EU granted Estimatedcost for the thewhole HL-LHC over 10 years in M€ (October 2010) LRossi@CERN-KEK Dec2011

  12. 3 days Collaboration Meeting at CERN 14-18 Nov (160 people)Collaboration Boardmembers/invited LRossi@CERN-KEK Dec2011

  13. LRossi@CERN-KEK Dec2011

  14. Staff HiLumi Design Study, with 377 p-m by US Labs and 159 by KEK (Magnets, CC, AP) 163 FTE-y LRossi@CERN-KEK Dec2011

  15. New baseline to follow the new EU strategy for HEP! Goal: HL-LHC approved by 2013 CB of 17 Nov 2011 , message fromPresident of Council, Prof. Spiro: PDR neededin preliminaryform by Oct 2012, endorsed by SAC and MAC, approved by CERN Mngt for Council and HEP strategy Group (final step : Council Bruxelles June 2013) Need to fixchoiceearlier LRossi@CERN-KEK Dec2011

  16. Malta Workshop14-16 October 2010HE-LHC @ 33 TeVc.o.m Magnet design: verychallanging but not impossible. 300 mm inter-beam Multiple powering in the samemagnet (and more sectioning for energy) Work for 4 years to assess HTS for 2X20T to open the way to 16.5 T/beam . Otherwiselimitfield to 15.5 T for 2x13 TeV Higher INJ energyisdesirable (2xSPS) The synchrotron light is not a stopper by operating the beamscreenat 60 K. The beamstability looks « easier » than LHC thanks to dumping time. Collimation ispossibly not more difficultthan HL-LHC. Reaching 2x1034appearsreasonable. The big challenge, after main magnettechnology, isbeamhandling for INJ & beam dump: new kickertechnologyisneededsincewecannotmaketwice more room for LHC kickers. LRossi@CERN-KEK Dec2011

  17. EC - FP7 EuCARD2 joint researchactivity WP10 : Future Magnets : 2013-2016. 5 T HTS DipoleMagnets40 mm bore Accelerator Quality To betested as insert in existing 13 T magnet KEK and Univ. of Kyoto (and 5 US labs & Univ) declaredassociatecollaborators. Interest in YBCO technology. LRossi@CERN-KEK Dec2011

  18. What is the possibile for HE-LHC? US basic programs and LARP R&D EU FP6-CARE-NED EuCARD 13 T large dipole+ 18 T small insert US 13 T Quads FP7-HiLumi US NbSn-HTS development US 16 T smalldipole LARP 11 T long quad EuCARD R&D 15-20 T R&D dipolemodels and prototypes 15-20 T dip final proto & Industrialization Final deliveryMagnets HE-LHC 2005 2010 2015 2020 2025 2030 2035 EuCARD2 full bore dipole HTS HE-LHC preliminarystudy HE-LHC start-up HTS for HE-LHC: yes.or.no Industrycontracts, startconstrution LRossi@CERN-KEK Dec2011

  19. HiLumi (and HE) LHC : the best use of the (renovated) existing infrastructure LHeC ? LRossi@CERN-KEK Dec2011