An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. General information about the Project Project Description Expected Results The AESOP Project Database Information Objectives Partners TIP Description of Work List of Work Packages

  2. Instrucciones: • Reemplazar iconos de ejemplo por iconos de documentos activos así: • Crear documento en Word. • Volver a PowerPoint. • En el menú Insertar, seleccione Objeto... • Haga clic en “Crear desde archivo” • Ubique el nombre de archivo en el cuadro “Archivo” • “Mostrar como icono” debe estar activado. • Haga clic en Aceptar • Seleccione un icono • En el menú Presentación, seleccione Configuración de la acción. • Haga clic en “Acción de objeto” y seleccione “Modificar” • Haga clic en Aceptar Project Description • Assessment of Energy Saving in Oil Pipelines • Project founded by the EC under the Energy, Environment and Sustainable Development. • Duration: 36 months - 2000/2003 • 6 European Partners

  3. Instrucciones: • Reemplazar iconos de ejemplo por iconos de documentos activos así: • Crear documento en Word. • Volver a PowerPoint. • En el menú Insertar, seleccione Objeto... • Haga clic en “Crear desde archivo” • Ubique el nombre de archivo en el cuadro “Archivo” • “Mostrar como icono” debe estar activado. • Haga clic en Aceptar • Seleccione un icono • En el menú Presentación, seleccione Configuración de la acción. • Haga clic en “Acción de objeto” y seleccione “Modificar” • Haga clic en Aceptar Objectives • To reduce the energy consumption and to increase the transport capabilities of oil pipeline networks • To develope the techniques required to use long-chain polymers as Drag Reducing Agent (DRA) in European oil pipeline networks

  4. Instrucciones: • Reemplazar iconos de ejemplo por iconos de documentos activos así: • Crear documento en Word. • Volver a PowerPoint. • En el menú Insertar, seleccione Objeto... • Haga clic en “Crear desde archivo” • Ubique el nombre de archivo en el cuadro “Archivo” • “Mostrar como icono” debe estar activado. • Haga clic en Aceptar • Seleccione un icono • En el menú Presentación, seleccione Configuración de la acción. • Haga clic en “Acción de objeto” y seleccione “Modificar” • Haga clic en Aceptar Partners • Compañía Logística de Hidrocarburos (CLH, S.A.) • Société du Pipeline Méditerranée Rhône (SPMR) • Energy Solutions (ESI) • Asociación para la Investigación y Cooperación Industrial de Andalucía (AICIA) • Fiat Research Centre (CRF) • Centre Spatial De Liege (CSL) • Société des Transports Pétroliers par Pipe-line(TRAPIL)

  5. Instrucciones: • Reemplazar iconos de ejemplo por iconos de documentos activos así: • Crear documento en Word. • Volver a PowerPoint. • En el menú Insertar, seleccione Objeto... • Haga clic en “Crear desde archivo” • Ubique el nombre de archivo en el cuadro “Archivo” • “Mostrar como icono” debe estar activado. • Haga clic en Aceptar • Seleccione un icono • En el menú Presentación, seleccione Configuración de la acción. • Haga clic en “Acción de objeto” y seleccione “Modificar” • Haga clic en Aceptar Description of Work • Experimental studies of the effect on oil product characteristics when high DRA rates are added. • laboratory tests and analysis to determine how long -chain polymers can be broken • Large scale experimental studies of the efficiency of long chain polymers on pipeline oil transportation systems with low/high DRA rates. • To obtain a model of how the polymers behave and how the injection rate affects the operation. • To establish a methodology for the use of polymers, considering specific instrumentation and computer aided design programs. • Database design and manteinance with the results of the tests.

  6. Instrucciones: • Reemplazar iconos de ejemplo por iconos de documentos activos así: • Crear documento en Word. • Volver a PowerPoint. • En el menú Insertar, seleccione Objeto... • Haga clic en “Crear desde archivo” • Ubique el nombre de archivo en el cuadro “Archivo” • “Mostrar como icono” debe estar activado. • Haga clic en Aceptar • Seleccione un icono • En el menú Presentación, seleccione Configuración de la acción. • Haga clic en “Acción de objeto” y seleccione “Modificar” • Haga clic en Aceptar Expected Results • Data base containing experiment data. • Set of models and corresponding validation procedures and validation results. • Computer programmes for designing and optimal operation of oil pipelines using DRA. • A prototype of equipment for polymer shearing at oil pipelines with validation data. • An assessment of the effect of DRA on quality of base products (gasolines and diesel oil) when high DRA rates are added. • Two of the partners’ oil pipelines with the instrumentation and operating procedures required for the use of DRA. • An assessment of the benefits obtained by the technique.

  7. General Characteristics of DB Independence between data andprocedures Standardised documentation Availability of the information Flexibility Quick and simple access Coherent information DBMS

  8. General Characteristics of DB Abstract Levels Data Models Formalisation User logic E/R Model Conceptual Global Logic Logical Relational Model (FNBCD) Physic structure Relational DB hierarchy DB Codasyl DB

  9. Technological Implementation Plan • The Technological Implementation Plan (TIP) is a specification for the exploitation of the results of the project. • It is concerned with the exploitable potential we have generated and how we plan to realise that potential. • It is to ensure that the maximum number of tangible and intangible resultsbecome available. • The Commission's monitoring and evaluation of the exploitation phase of your project will be based on the TIP so it is an important planning document, not just a deliverable. • A good TIP is the best way to demonstrate to the Commission the value of the results. • It is an active document that can be completed at the start of the project and updated at mid-term and at project completion.

  10. Technological Implementation Plan 1.- Overview and description of all project and results (Publishable). It will be used to document the results in CORDIS. 2. -Description of the intentions for dissemination and use by each partner (Confidential) 3.- Search for collaboration through Commission services (Optional, Publishable) 4.- Assessment of the European interests (Publishable). Co-ordinator to explain the interest for the European Union of the achieved results

  11. List of Work Packages

  12. List of Work Packages

  13. WP Global Structure Partner’s Previous Experience WP5: Project Management WP1:Assessment of effect on fuel performance for high additive concentrations WP2:Experimental field studies of flow improvers WP4:Methodology for the use of long chain polymers WP3:Effectivenessmodel development

  14. WP1 WP 1 Assessment of effect on fuel performance for high additive concentrations 1.1 Laboratory analysis of oil product specifications with DRA 1.2 Laboratory test for polymer shearing 1.3 Assessment of effect on engine behaviour 1.4 Assessment of effect on injectors 1.5 Database of fuel performance WP2

  15. WP2 WP2 Experimental field studies of flow improvers 2.2 Conditioning of installations 2.1 Test Design 2.3 Effectiveness analysis of long chain polymer 2.4 Length and Discontinuity Influence 2.5 Influence on Measurement Equipment WP1 2.6 Database of experimental field tests WP3, WP4

  16. WP3 Effectivity model development 3.1 Model of 3.2 Model of WP1, WP2 WP4 polymer efficiency polymer degradation WP3

  17. WP4 Methodology for the use of polymers 4.1 Software requirements 4.2 Pipeline WP1 4.3 Installation 4.4 Optimal simulation package design algorithms operation algorithm WP2 WP3 4.5 Software integration 4.6 Guidelines for the use of polymers WP1 WP2 WP3 WP4

  18. Deliverables I

  19. Deliverables II

  20. Milestones

  21. EXIT Conclusions •Expected results: *reduction of more than 25 % in the energy required for ton-km of the base products. *increase in the capacity of more than 30 % in terms of ton-km. •Reduction of the price of energy: this will contribute towards the competitiveness of the oil pipeline partners. •An important social benefit can be obtained combating the saturated European road and highway system.