1 / 38

21 ISMOR 1 September 2004 Analytic Decision Support in a Civilian Organization:OPP&A in the CPA

21 ISMOR 1 September 2004 Analytic Decision Support in a Civilian Organization:OPP&A in the CPA David F. Davis George Mason University Ddavis@gmu.edu http://popp.gmu.edu. OED. IRMO/Planning. OPP&A. POPP. I’m really not representing any of these!. Our Logo from IRMO/Planning.

traci
Télécharger la présentation

21 ISMOR 1 September 2004 Analytic Decision Support in a Civilian Organization:OPP&A in the CPA

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 21 ISMOR 1 September 2004 Analytic Decision Support in a Civilian Organization:OPP&A in the CPA David F. Davis George Mason University Ddavis@gmu.edu http://popp.gmu.edu

  2. OED IRMO/Planning OPP&A POPP I’m really not representing any of these!

  3. Our Logo from IRMO/Planning (I’ll use it from here on)

  4. Decision Support The Plans The Questions The Analysis The Issues

  5. The Plans Military Campaign Plans Civilian Plans Future of Iraq – DOS Late 2002 Unified Mission Plan – CPA April 2003 Initial Strategic Plan – CPA late summer 2003 Transition Strategic Plan – CPA November 2003 Mission Performance Plan – Embassy July 2004 OIF 1 – Coalition 2002/2003 – Coalition April 2003 – Coalition Nov. 2003 Update – MNF-I July 2004 Initial planning appears to have been disconnected. Subsequent planning was more coordinated. MNF-I and late CPA/Embassy planning verged on collaboration.

  6. The CPA Strategic Plan Towards Transition Based, in part, on previous work done for other missions, the Strategic Plan began with the primary goal of CPA and refined each of the sub-goals, or sectors, into objectives – then key tasks – and finally sub-tasks. The sub-tasks were monitored on a weekly basis and progress was identified by the responsible – operational – organization.

  7. A Look at the MPP • Three overarching themes are addressed in the introduction to the MPP. • Fighting Terror • Building Democracy • Reconstruction and Economic Development. • These same three themes are put forth by Ambassador Negroponte quite frequently as: • Political: Democratization and the Rule of Law • Economic: Development and Reconstruction • Security: Eliminating Terrorism and Providing Public Safety

  8. Structure of the MPP Performance Goal Papers Strategic Goals Performance Goals Strategies Tactics Performance Indicators The structure of the MPP is similar to that of the Strategic Plan – it is a decomposition of goals to activities.

  9. Performance Goal Papers I – Prevention and Response to Terrorism II – Regional Stability III – Weapons of Mass Destruction IV – Democracy and Human Rights V – Economic Prosperity and Security VI – Consular Affairs VII – Mission Security VIII – Mutual Understanding IX – Education and Health Services X – Humanitarian Response XI – Management and Organizational Excellence • Although comprehensive, these Goal Papers do not track directly with the themes. Very generally, they map as follows: • Political: IV, VIII • Economic: V, IX, X • Security: I, II, III • With the core Embassy Operations accounting for VI, VII and XI.

  10. Other Categorization Schemes UN Clusters World Bank Sectors 2207 Categories USAID Primary Sectors The Conceptual Model of Peace Operations Although very similar, the determination of what activity or project belongs to what category becomes very difficult to predetermine. Knowing this ‘mapping’ is essential as we try to understand how spending and resource allocation relates to the overall goals and priorities of the Mission.

  11. The Questions The bottom line: Not enough! However, most of the questions revolved around priorities. Under CPA: - What are the risks to the Transition? - What should be the top five priorities for the Administrator? Under IRMO: - How should the $18.4B be allocated? - What should be measured?

  12. The Analysis The bottom line: Not enough! However, most of the questions revolved around priorities. Under CPA: - What are the risks to the Transition? - What should be the top five priorities for the Administrator? Under IRMO: - How should the $18.4B be allocated? - What should be measure?

  13. The Risks Identifying the risks to the transition required that we used the current Strategic Plan. If the Objectives of the Strategic Plan represent the requirements, then the Amber and Red Objectives should help us begin the analysis of Risk – Probability of Failure.

  14. Goal Tree

  15. Tree Update

  16. The Model

  17. Microsoft Belief Network

  18. Microsoft Belief Network Evaluated

  19. The Allocation How can we propose a reallocation of the $18.4B? This effort has consumed the Embassy, although it was never a major issue in the CPA. This dichotomy may well be the source of many books over the next several years. Beginning in early June, the IRMO Planning office began to look at this issue from a goals based perspective.

  20. MPP High Level Goals Security Economic Eliminate Terrorism Economic Development DGS The analysis was an attempt to show the relationship between the ‘plan’ and the $18.4B. Democratization and the Rule of Law Political

  21. MPP Strategic Goals 1 Counter Terrorism 2 A Strong Reliable Regional Partner 5 Sustainable Growth 3 Complete and Verifiable Disarmament 9 Social, Environmental, Health and Education 4 A Democratic and Free Iraq 10 Refugees and IDPs

  22. PMO Categories Impacting MPP Strategic Goals Security and Law Enforcement Electricity Transportation and Telecommunications Oil Water Resources and Sanitation Health Justice, Public Safety Infrastructure and Civil Society Education, Refugees, Human Rights and Governance

  23. USAID Sectors Impacting MPP Strategic Goals Ports and Airports Public Utilities and Infrastructure Health Education Emergency Local Governance and Civic Action Economic Recovery, Reform and Sustained Growth

  24. 993 Ongoing or Completed Million US$ 53 Public Utilities and Infrastructure 0 Ports and Airports Security and Law Enforcement Electricity Transportation and Telecommunications Oil 471 661 752 Water Resources and Sanitation 232 Justice, Public Safety Infrastructure and Civil Society Education, Refugees, Human Rights and Governance 0 Health 31 42 0 Health Education 1.5 Emergency 90 Local Governance and Civic Action Economic Recovery, Reform and Sustained Growth 64 15 USAID project money only, does not include program overhead and direct salaries PMO as of 14 June 2004, USAID as of 17 June 2004

  25. $3,162M Ongoing or Completed Million US$ Public Utilities and Infrastructure Ports and Airports Security and Law Enforcement Electricity 13:1 Oil Transportation and Telecommunications Water Resources and Sanitation Justice, Public Safety Infrastructure and Civil Society Education, Refugees, Human Rights and Governance Health Health Education Emergency Local Governance and Civic Action Economic Recovery, Reform and Sustained Growth $243.5M USAID project money only, does not include program overhead and direct salaries

  26. How should we be spending the money? If we are to be spending the money to further the goals of the Mission, then we should try to understand how each of the projects and activities contribute to those goals. This will require some innovative thought on the part of all stakeholders: US, International Partners and the Iraqis. • The IRMO Planning approach to this problem uses both quantitative and qualitative techniques of Management Science and Operations Research. • Identify projects and activities within funding sectors by source of funding and primary agent (PCO, USAID, IC, Iraqi) • Score these projects, within sectors, on the project’s/activity’s contribution to the second level Goals of the COM. • Score the second level Goals on their contribution to the overall Mission. • Determine the combined scores for each alternative allocation strategy. The choice of allocation strategy will be made by the leadership, not the analyst.

  27. Identify contribution of projects and activities to the sectors. The advocacy briefings indicated that in sector priority lists exist in almost every case. These priority lists and the contribution of the project to the mission goals could be used to provide for project scoring within sector. However, this initial effort is focused on determining an investment strategy, not individual sector spending plans. The scoring must represent the general utility expected of a project within a sector.

  28. Alternative Allocations GAO Sector Description

  29. Review Scoring: Contribution of Projects to Goals Contribution of Projects to Sectors Contribution of Goals to Mission

  30. The Model Allocate resources to the sectors in order to maximize the total utility (effectiveness), subject to the requirement that the total resources do not exceed $M (currently set to $18.2m). Maximize Where wi is the Weight of Sector i, ui is the utility of Sector i , ai is the distribution to Sector i, and fi is defined as a piece-wise linear function. S.T. And

  31. Utility Functions – fi U 1.0 U = M(2)*A + B X U = M(1)*A A, in $ A(1) A(N)

  32. In Sector Utilities Utilities (1.0 Maximum) ($1000s)

  33. Sector Weights

  34. Alternative Comparisons Change from Base

  35. Relative Scores The combination of effectiveness and importance allows for a calculation of the overall score.

  36. The Issues Culture of Analysis Intent of the Office v. Background of the Director Asking questions for which answers are desired

  37. Cornwallis X Proposed Theme: Analysis for the Multi-National Inter-Agency The ‘Multi-Agency.’ Location is being decided by the committee since the Pearson Peacekeeping Centre is no longer available for conferences in residence. 1: The Royal Military College in Kingston, Ontario, Canada 2: The Boyana Palace, Sofia, Bulgaria 3: The Holiday Inn – Las Cruces, Las Cruces, New Mexico, USA

  38. Cornwallis Committee Members Mr. S Anders Christensson National Defence College SE 117 93 Stockholm Sweden +46 70 628 9678 Voice s.anders.christensson@fhs.mil.se Dr. Reiner K. Huber Bundeswehr University D-85577 Neubiberg Germany +49(089)6004-2206 Voice huber@informatik.unibw-muenchen.de Dr. George Rose Group Leader Support to Operations PCS Department Dstl Farnborough +44 1252 45 1825 Voice grose@dstl.gov.uk Mr. E.P. Visco 3752 Capulet Trace Silver Spring, MD 20906 +1 (301) 598-8048 [Voice/Fax] gvisco@bellatlantic.net Larry Wentz GMU Center of Exellence in C3I +1 703-757-1250 Voice +1 703-757-1251 Fax lwentz@bellatlantic.net Professor D.F. Davis, Program Chair George Mason University, MS3B1 3401 N. Fairfax Dr. Arlington, VA 22201, USA +1 (703) 993-1703 Voice ddavis@gmu.edu Dr. Ted Woodcock, Co-Chair and Editor School of Public Policy 4400 University Dr. Fairfax, VA 22030 +1 (703) 993-2280 Voice aerw@gmu.edu Mr. Karl Bertsche Daimler-Benz/Dornier 88039 Friedrichshafen, Germany +49(7545)89613 Voice Karl.Bertsche@dornier.eads.net Dr. Paul Chouinard Strategic Planning Operations Research Team 101 Colonel Bye Dr. Ottawa, Ontario Canada, K1A OK2 +1 (613) 992-4500 Voice chouinard.p1@forces.gc.ca

More Related