1 / 2

Radiation Test Campaign 2009 – TE-MPE-CP

Radiation Test Campaign 2009 – TE-MPE-CP. The foreseen tests concern principally equipment of the QPS upgrade to be installed in the LHC arcs Expected hadron flux (E > 20 MeV ): up to 10 10 cm -2 y -1 Equipment under test Field-bus coupler type DQAMGS (1x)

trevet
Télécharger la présentation

Radiation Test Campaign 2009 – TE-MPE-CP

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Radiation Test Campaign 2009 – TE-MPE-CP • The foreseen tests concern principally equipment of the QPS upgrade to be installed in the LHC arcs • Expected hadron flux (E > 20 MeV): up to 1010 cm-2y-1 • Equipment under test • Field-bus coupler type DQAMGS (1x) • Latest MicroFipTM version • Field-bus coupler type DQAMS600 • Old MicroFipTM version • Used for test controls and DAQ for TE-MSC-SCD test • Bus-bar protection system type DQQBS (2x) • High precision systems based on device already tested last year on CGNS • Micro-converters, DC-DC converters, amplifiers etc. • Verification of firmware (error correction code), drifts etc.

  2. Radiation Test Campaign 2009 – TE-MPE-CP • Equipment under test • Symmetric quench detection system type DQQDS (2x once prototypes are available) • New development – individual components successfully tested @ PSI in March 2009 • Flash based FPGA, ADCs, amplifiers • Verification of firmware (error correction code), drifts, false triggers etc. • Power pack prototype unit • LDO regulators (also tested @ PSI), rectifier bridges • Equipment under test is not expected to show fatal errors • Test should simulate LHC environment • Low flux required (TSG46B) • Support for TE-MSC-SCD by providing DAQ channels • Solid state relays used for the HTS current lead heating system

More Related