1 / 11

New EVENT AT Port Muhammad Bin Qasim Pakistan

AARAS SHIPPING AGENCIES PRIVATE LIMITED Break Bulk, Heavy Lift, ODC, Ro-Ro & Project Cargo Experts in Pakistan. New EVENT AT Port Muhammad Bin Qasim Pakistan. Uch POWER PROJECT.

tybalt
Télécharger la présentation

New EVENT AT Port Muhammad Bin Qasim Pakistan

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AARAS SHIPPING AGENCIES PRIVATE LIMITEDBreak Bulk, Heavy Lift, ODC, Ro-Ro & Project Cargo Experts in Pakistan.

  2. New EVENT AT Port Muhammad Bin Qasim Pakistan

  3. Uch POWER PROJECT AARAS SHIPPING AGENCIES (PVT) LTD are proud to announce that we have successfully handled the 2nd Part of UCH PowerProject vessel into our agency with complete logisticssolution till site. Vessel particular’s are: M.V. FREDENSBORG Port of Loading; Kusan Korea Port of Discharge; Port Mohammad Bin Qasim Commodity; Condenser, HSD Electric heater, Boiler feed Pump, Condensate Extraction pump, control valves and Auxiliaries Total Packages; 55 Pkgs Total Cargo Weight; 395.310 Mtons

  4. BERTHING OF THE VESSEL; The Vessel M.V. “Fredensborg” berthed MW-3 Port Muhammad Bin Pakistan on 14th Dec 2012 at 1200 hrs.

  5. CARGOES ON THE VESSEL; The vessel carrying 55 package of Condenser, HSD Electric heater, Boiler feed Pump, Condensate Extraction Pump, Control valve and other auxiliaries of Steam Turbine Generator with Gross Weight 395.310 Mtons and 1775.72 CBM

  6. DISCHARGING THE CARGOES; The discharging process was commenced at 1200 hrs on 14th Dec 2012 and Completed at 0720 hrs on 15 Dec 2012. We finished the whole process of discharging within 19 hrs.

  7. TRANSPORTATION OF CARGOES; Transportation of these equipment’s made through low bed trailer and rest of onto standard trailer for the 595 kilo meter inland to project site.

  8. Contact Us; …..AARAS – READY FOR ACTION – Whatever you’re planning, we’re there for you!! 701, 7th Floor, Business Plaza, Mumtaz Hassan Road, Off I.I. Chundrighar Road, Karachi – 74000, Pakistan. Tel: +92-21-32415450-1 Fax: +92-21-32420412 E-mail: info@aarasshipping.com Website: www.aarasshipping.com

  9. Good bye !

More Related