1 / 29

Germania Unit Rate Forecasting Based on Other Waterflood Pilots in the Spraberry Area

Germania Unit Rate Forecasting Based on Other Waterflood Pilots in the Spraberry Area. Objectives To propose the location of new injection wells in the Germania Unit.

tymon
Télécharger la présentation

Germania Unit Rate Forecasting Based on Other Waterflood Pilots in the Spraberry Area

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Germania Unit Rate Forecasting Based on Other Waterflood Pilots in the Spraberry Area

  2. Objectives • To propose the location of new injection wells in the Germania Unit. • To forecast the incremental oil recovery due to waterflooding in other waterflood Pilot area. The rate forecast is applied to Germania Unit for economic purpose.

  3. FUTURE WORK (Last Meeting) • Improve OFM model to get external data from other Database systems, such as ODBC (Microsoft Access, Dwights and PI). • Perform similar tasks for ET O’Daniel Pilot Area • Perform reservoir simulation

  4. Coupling between Injector and Producers • The coupling is taken based on the production response in the on trend and off trend wells during the waterflood period. • This coupling could be used to determine the new location of injection wells.

  5. Germania (Spraberry) Unit Layout • The red line indicates a coupling between an injector and producers and rectangular box indicates the well has available production history. • WIWs #8, 11, and 15 did not have significant effect on surrounding oil production wells. • The production responses obtained from coupling between an injector and producers are parallel to the fracture orientation in NE-SW direction.

  6. Germania (Spraberry) Unit Layout The green ring fence is taken from the O’Daniel Pilot assuming this unit would behaves similar response. The circle mark indicates the proposed injection wells. From the coupling between injection and production shows that the location of proposed injection wells #408A and 10 should be relocated because they are along old injector path. The wells that have shown good waterflood response in the other Pilots are analyzed to determine the incremental oil recovery during waterflooding. The results are applied to Germania Unit for economic purpose.

  7. Water Injection in The Germania Unit

  8. Production Summary of GSU - 21 TOW

  9. Decline Curve Analysis of GSU – 21 (GSU – 27 as an Injector)

  10. Production Summary of The Germania Unit

  11. Decline Curve Analysis in The Germania Unit Based on Current ET O’Daniel Waterflood Pilot

  12. Rate Forecasting based on Incremental Oil from Current ET O’Daniel Waterflood Pilot

  13. Decline Curve Analysis in The Germania Unit Based on Old ET O’Daniel Waterflood

  14. Rate Forecasting based on Incremental Oil from Old ET O’Daniel Waterflood

  15. Infill Well vs. Waterflooding

  16. Cumulative Oil Comparison between Infill Well and Waterflooding Scenarios

  17. Decline Curve Analysis 28 Wells in The E.T O’Daniel Pilot Area

  18. Decline Curve Analysis 28 Wells in The E.T O’Daniel Pilot Area

  19. Incremental Oil Rate 28 Wells in The E.T O’Daniel Pilot Area

  20. Production Summary of The Old ET O’Daniel Waterflood

  21. Decline Curve Analysis Old E.T O’Daniel Performance

  22. Incremental Oil Rate Old E.T O’Daniel

  23. Total Incremental Oil Production Old E.T O’Daniel

More Related