An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Screen printing MM test,current status and plans Atsuhiko Ochi Kobe University 6, November 2012 ATLAS MicroMEGAS meeting

  2. Status of chamber preparation • Screen printing – MM has already been assembled with gas package. • Readout : 1-Dimensional, 400um pitch • Gas gap : ~ 100 um (estimated) • Drift length : ~ 1cm • Operation test • Gas: Ar:C2H6 (7:3) • Signal of beta source (90Sr) were observed • No HV current found (<10nA) • At first, in the burn-in stage, we found steady current of a few micro ampere. • Estimated gain … a few thousand • Vstrip = +520V, Vdrift = -1kV • We need to reduce the nise. A. Ochi, Kobe Univ.

  3. Test plan at CERN • Site of the test • H6 test bench, using parasite beam • Schedule • Because of administration work, we will be ready to enter the test beam site from 14th November. • We will check position/timing resolution for various voltages of strips and drift plane. • We will take a data for comparing to existing MMs. • Estimated test term is one week • Maximum, 2 weeks. • Ochi and Edo will join from Kobe. • We need helps from test beam experts. • Materials to be need • Readout: Two APV25 cards and their readout system • HV supplies (Positive and Negative) • Gas system A. Ochi, Kobe Univ.