An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Management

  2. Introduction • What – Project Management • Where – Where the success or failure of a project will have major consequences for the company • Why – At some point every company takes on large and complicated projects – opening a new store, building a plant, developing a product

  3. Project Management • What is at stake? • Large projects, outside of normal production • Cost overruns • Late completion – penalties • Early completion – bonuses

  4.  Project Planning • Project organization • Project manager

  5. Project Planning • Planning Task • Work Breakdown Structure • Determines gross requirements for people, supplies and equipment

  6. Work Breakdown Structure • Level • 1 Project • 2 Major tasks • 3 Subtasks • 4 Activities

  7. Example • Level • 1 Open a new Retail Outlet • 2 Select Location • 2 Refurbish Location • 3 Signage • 4 Install new sign • 3 Displays • 4 Install racks • 4 Install Mannequins

  8. Project Scheduling • Sequence project activities • Allotting time

  9. Gantt Chart

  10. Project Controlling • Monitor resources, costs, quality, and budgets • Use feedback to revise project plan

  11. PERT and CPM • Program Evaluation and Review Technique • Critical Path Method • Schedule, monitor and control large projects

  12. PERT and CPM Framework • Define project • Develop relationships among activities • Draw network connecting activities • Assign time / cost estimates to each activity • Compute longest time path through network – the critical path • Use network to plan, schedule, monitor, control project

  13. Difference Between PERT and CPM • CPM – one estimate of time • PERT three estimates with probabilities

  14. Project: Obtain a college degree (B.S.) Receive diploma Register Attend class, study etc. 1 2 4 Years Activity (Arrow) Event (Node) Event (Node) PERT Symbols

  15. 2 A 1 3 B A & B can occur concurrently PERT Symbols

  16. A must be done before C & D can begin 2 D A C 1 4 3 B PERT Symbols

  17. 2 D A C 1 4 3 B E B & C must be done before E can begin PERT Symbols

  18. Activity Time Estimates • Optimistic Time (a) • Most Likely Time (m) • Pessimistic Time (b) • Beta distribution • Expected Time t = (a + 4m + b) / 6 • Variance v = [(b – a)/6]2

  19. Critical Path Analysis • ES – Earliest Start Time • LS – Latest Start Time • EF – Earliest Finish • LF – Latest Finish • S – Slack Time – LS – ES • Critical Path – Group of activities in the project that have a slack time of zero • T – total project completion time • V – total variance of activities on the critical path

  20. Project Crashing • Crashing – shorten activity time by adding resources • Can be expensive – may be less expensive than cost penalties

  21. PERT Advantages • Useful at several stages, especially scheduling and control • Not mathematically complex • Graphical display show relationships • Critical path pinpoints activities to closely monitor • Documents who is responsible for each activity • Applicable to a wide range of industries • Monitors schedules and costs

  22. PERT Limitations • Project activities clearly defined, independent, stable in their relationships • Precedence relationships must be specified in advance • Time estimates are subjective • Danger of too much emphasis on critical path