1 / 2

Cash Processing

ATTACHMENT B Toll Collections – (1/2004). Cash Processing. RM1. BATA Accounting. Manual (Cash) Toll Lane Booth Staffing. Cash Vault. Bank Deposit. Seismic Account. Caltrans Toll Accounting. ATCAS Maintenance & Operations. ETC Processing. ETC Toll Lane Equipment

ursala
Télécharger la présentation

Cash Processing

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ATTACHMENT B Toll Collections – (1/2004) Cash Processing RM1 BATA Accounting Manual (Cash) Toll Lane Booth Staffing Cash Vault Bank Deposit Seismic Account Caltrans Toll Accounting ATCAS Maintenance & Operations ETC Processing ETC Toll Lane Equipment Maintenance FasTrak Customer Service Center HQ Sac Accounting Caltrans BATA

  2. ATTACHMENT B Toll Collections/Operations – 1/2007 Cash Processing RM1 RM2 (7/2004) Seismic Account (7/2005) Manual (Cash) Toll Collection Bank Deposit Cash Vault (7/2004) BATA Toll Accounting (4/2006) ETC Processing ATCAS Toll Lane Equipment Maintenance (9/2005) ATCAS IT Maintenance and Operations (9/2005) FasTrak Customer Service Center (4/2004) Caltrans BATA

More Related