SHRIRAM FOUNDRY LTD.MACHINE SHOP

SHRIRAM FOUNDRY LTD.MACHINE SHOP. July. 2011. TEAM MEMBER:-. Mr.P.S.ACHARI Mr.P.K.PATIL. Mr.R.R.NERLEKAR. Mr.G.M.SHAIKH Mr.S.B.PATIL. COMPARATIVE PRODUCTION STATUS. PART NAME & NUMBER:- CONMET FRONT HUB - 10001946. ( Rough to finish Component in production.

Télécharger la présentation

SHRIRAM FOUNDRY LTD.MACHINE SHOP

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SHRIRAM FOUNDRY LTD.MACHINE SHOP July. 2011

  2. TEAM MEMBER:- • Mr.P.S.ACHARI • Mr.P.K.PATIL. • Mr.R.R.NERLEKAR. • Mr.G.M.SHAIKH • Mr.S.B.PATIL

  3. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- CONMET FRONT HUB - 10001946 ( Rough to finish Component in production. ( Rough to finish 44 nos per shift – 1set up s/f & 2 set up finish) 400 nos casting stock at our end & 144 ready for dispatch.Job in production.

  4. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- CONMET ROTTER - 10009996 Rough to finish trial success, Casting stock – 406,Ready for dispatch – 104) 2 set up rough & 1set up finish per shift 45 no's

  5. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- CONMET HUB 10019727 Spline After removing the setting 50 nos casting received. Casting stock – machined, Ready for dispatch – 27 nos.

  6. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- CONMET HUB – 10019716 Spline Component in production

  7. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- CONMET HUB – 10019736

  8. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- CONMET HUB – 10019759 After removing the setting 74 nos casting received.

  9. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- CONMET HUB – 10019815 After removing the setting 170 nos casting received.

  10. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- CONMET FRONT HUB – 10020463 – High BHN Productivity increased per shift 22 to 28 nos.

  11. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- Pulley 476.0 Casting late received. Job in production

  12. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- CLASS PULLEY – 644 800.2 Casting to finish trial success – per shift 21 nos.

  13. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- Pulley 642.0

  14. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- Pulley 413.0 96 nos ready for dispatch

  15. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- Pulley 266.0

  16. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- Pulley 145.0

  17. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- Pulley 771.0 48 nos Ready for dispatch. Casting to finish trial success – per shift 21 nos.

  18. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- Pulley 189.0

  19. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- Pulley 190.0

  20. COMPARATIVE PRODUCTION STATUS PART NAME & NUMBER:- Nabe 1975457 Component in production.

  21. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- CONMET HUB 1946 For mnt variable bearing cost is 36020 RS,deduct this amount then cost – 23.16 RS. Note:- To calculate labor cost take 35% overhead on Basic+DA

  22. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- CONMET HUB 20463 SOMT 09T306 DT IC908 brokan Rs. 14954 Tool Cost RS. -68.39 Note:- To calculate labor cost take 35% overhead on Basic+DA

  23. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- CONMET HUB 9716 - Spline Note:- To calculate labor cost take 35% overhead on Basic+DA

  24. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- CONMET HUB 9727 - Spline Total Production 50 nos. Ø 17 Carbide Drill Tool Cost Rs. 54.84 Note:- To calculate labor cost take 35% overhead on Basic+DA

  25. COST DETAILS(ITEMWISE) PART NAME & NUMBER:-CONMET ROTTER 9996` Casting to Finish For mnt variable bearing cost is 36020 RS,deduct this amount then cost – 23.16 RS. Note:- To calculate labor cost take 35% overhead on Basic+DA

  26. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- CONMET HUB – 9815 Note:- To calculate labor cost take 35% overhead on Basic+DA

  27. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- CONMET HUB – 9759 Ø24 U Drill 1 nos. & SHR/450 4 nos Total Rs. 24925 Tool Cost Rs.-58.90 Note:- To calculate labor cost take 35% overhead on Basic+DA

  28. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- CONMET HUB – 9736 Note:- To calculate labor cost take 35% overhead on Basic+DA

  29. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- CONMET HUB – NEB HUB 5457 TCLNR -2525 HOLDER RS-1500 TOOL COST RS.15.55 Only Truning Note:- To calculate labor cost take 35% overhead on Basic+DA

  30. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- CONMET HUB – Housing 619 Note:- To calculate labor cost take 35% overhead on Basic+DA

  31. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- Pulley 771 TTER &A4 SMR Holder Rs. 11947 Tool Cost Rs. 144.74 Casting to Finish TTER -2525 A4SML 2525 HOLDERRs. 9000 Tool Cost Rs. 244.96 TTER &A4 SMR Holder Rs. 11947 Tool Cost Rs. 184.09 Note:- To calculate labor cost take 35% overhead on Basic+DA

  32. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- Pulley 642 For mnt variable bearing cost is 36020 RS,deduct this amount then cost – 23.16 RS. Note:- To calculate labor cost take 35% overhead on Basic+DA

  33. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- Pulley 266 A 4 SMR Holder 3 Nos. Rs. 26945/- Tool Cost Rs. – 104.63 Note:- To calculate labor cost take 35% overhead on Basic+DA

  34. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- Pulley 145.0 Tool Cost Rs. 106.31 For mnt variable bearing cost is 36020 RS,deduct this amount then cost – 23.16 RS. Note:- To calculate labor cost take 35% overhead on Basic+DA

  35. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- Pulley 413 Note:- To calculate labor cost take 35% overhead on Basic+DA

  36. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- Pulley 476 Note:- To calculate labor cost take 35% overhead on Basic+DA

  37. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- Pulley 189-190 4ASMR -2525 3 HOLDER & Ø11.1 CARBIDE DRILL RS. 17286 TOOL COST RS. 34.89 For mnt variable bearing cost is 36020 RS,deduct this amount then cost – 23.16 RS. Note:- To calculate labor cost take 35% overhead on Basic+DA

  38. COST DETAILS(ITEMWISE) PART NAME & NUMBER:- Pulley 800.2 WTJNL-2525, A4SMR 2525 HOLDER RS. 6200 TOOL COSTRS. 205.86 Note:- To calculate labor cost take 35% overhead on Basic+DA

  39. MACHINE UTILISATION IN % (CNC)

  40. MACHINE UTILISATION IN % (CNC)

  41. MACHINE UTILISATION IN % (CNC)

  42. MACHINE UTILISATION IN % (CNC)

  43. Majour Losess Details (Whole shop)

  44. REJECTION DETAILS(ITEMWISE IN %) Part Name:- CONMET HUB 1946 PRD-838 NOS, IN H MR 4.42%( 37) PRD-427 NOS, IN H MR-1.87%( 8) PRD-461 NOS, IN H MR-1.52%( 7) SF MR- 0.22% (1) ***ACTION ON MAJOR REJECTION CAUSES

  45. REJECTION DETAILS(ITEMWISE IN %) Part Name:- CONMET ROTTER 9996 PRD- 700 NOS, SF MR 3.57% (25 ), IN H MR1.00% (7 ) PRD- 1285 NOS, SF MR 1.25% (16 ), IN H MR1.48% (19 ) PRD- 637 NOS, SF MR 1.73% (11 ), IN H MR 0.78% (5 ) ***ACTION ON MAJOR REJECTION CAUSES

  46. REJECTION DETAILS(ITEMWISE IN %) Part Name:- CONMET 10020463 PRD- 634 NOS,, IN H MR 5.04%(32), SF MR 1.57 % ( 10) PRD-394 NOS,, IN H MR 3.05%(12), ***ACTION ON MAJOR REJECTION CAUSES

  47. REJECTION DETAILS(ITEMWISE IN %) Part Name:- CONMET 10009727 PRD- 214 NOS,, IN H MR 7.47 %(16) PRD- 347 NOS,, IN H MR 1.15 %(4) ***ACTION ON MAJOR REJECTION CAUSES

  48. REJECTION DETAILS(ITEMWISE IN %) Part Name:- CONMET 10019716 PRD- 88NOS,, IN H MR 1.14%(1), ***ACTION ON MAJOR REJECTION CAUSES

  49. REJECTION DETAILS(ITEMWISE IN %) Part Name:- CONMET 10019815 PRD- 237NOS,, IN H MR 8.44%(20), PRD- 367NOS,, IN H MR 6.54%(24), ***ACTION ON MAJOR REJECTION CAUSES

  50. REJECTION DETAILS(ITEMWISE IN %) Part Name:- CONMET 10019736 PRD- 118NOS,, IN H MR 5.08%(6), PRD- 383NOS,, IN H MR 1.57%(6), ***ACTION ON MAJOR REJECTION CAUSES