1 / 2

Electricity production Location = Narita Angle on roof = 26.6 degree

Japanese Business Case Residential house. Electricity production Location = Narita Angle on roof = 26.6 degree Production variable every month Estimated production = 5 667 kWh/year = 1286 liter of fuel/year = 1782 kg CO2/year = 127 trees planted

vanya
Télécharger la présentation

Electricity production Location = Narita Angle on roof = 26.6 degree

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Japanese Business Case Residential house Electricity production Location = Narita Angle on roof = 26.6 degree Production variable every month Estimated production = 5 667 kWh/year = 1286 liter of fuel/year = 1782 kg CO2/year = 127 trees planted 20% own consumption – electricity price = 22.86 JPY/kWh 80% sold on network – special feed-in-tariff = 42 JPY/kWh From 2013 April 1st = 37.8 JPY/kWh Gain = 216 321 JPY / year (Mitsubishi Panels) Installation cost 24 panels x 212 W/panel = 5088 Wpeak total Cost of panel only <100 JPY/Wpeak Subsidy – State + city = 0.3 MJPY If total cost: 450 JPY / Wpeak 2.3 MJPY  2.0 MJPY (after subsidy)  Payback = 9.2 years If total cost: 300 JPY/Wpeak  1.5 MJPY  1.2 MJPY (after subsidy)  Payback = 5.5 years

  2. BelgianBusiness Case Residential house Electricity production Location = Fernelmont, South-East Angle on roof = 35 degree Production variable every month Actual production = 4805 kWh/year Electricity = 20 EUR cent/kWh = 961 EUR/ year Green Certificate =7CV/MWh at 65 EUR/CV = 2186 EUR/year Tax reduction (ended in 2011) – gain = 4000 or 5000 EUR (Soluxtec Panels) Installation cost (2011) 20 panels x 250 W/panel = 5000 Wpeak total Cost of panel only <1 EUR/Wpeak Total cost: 3.2 EUR / Wpeak 15.9 kEUR Payback < 3 years Today cost in Belgium: 2 EUR/Wpeak System changed in Belgium = lot less advantageous in 2013

More Related