NASEB Energy Day. Chris Advena Transmission Team Lead March 21 and 22, 2005. NEASB Energy Day. PJM Data Sources PJM OASIS http://oasis.pjm.com/indexmain.html PJM eData https://esuite.pjm.com PJM home page http://www.pjm.com. OASIS. Operational Data. OASIS Main. OASIS Data.

varsha
Télécharger la présentation

NASEB Energy Day

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NASEB Energy Day Chris Advena Transmission Team Lead March 21 and 22, 2005

  2. NEASB Energy Day • PJM Data Sources • PJM OASIS http://oasis.pjm.com/indexmain.html • PJM eDatahttps://esuite.pjm.com • PJM home pagehttp://www.pjm.com

  3. OASIS Operational Data

  4. OASIS Main

  5. OASIS Data • System Information • Transmission Facilities Descriptions • Dispatch Rates • LMP Prices • Pricing Point Calculator • Emergency Procedures • RTOR Information • Additional RTOR Information as of 02/16/2005 • Quad Cities West Information • PJM Coordinated Flowgates as of 01/10/2005 • Process of Sharing or Transferring Unused Allocations • Allocation Results as of 03/01/2005

  6. OASIS Data • System Information • Transmission Facilities Descriptions • Dispatch Rates • LMP Prices • Pricing Point Calculator • Emergency Procedures • RTOR Information • Additional RTOR Information as of 02/16/2005 • Quad Cities West Information • PJM Coordinated Flowgates as of 01/10/2005 • Process of Sharing or Transferring Unused Allocations • Allocation Results as of 03/01/2005 • System Conditions Impacting PJM ATC • PJM Transmission Facilities Complete Descriptions • PJM Transmission Facilities Outage List • PJM Transmission Facilities Outage List new • PJM Dispatch Rates (new 15 second interval) • PJM Real-Time Operational Data LMP, Transfer Limits, Instantaneous Load, and Transmission Constraints • Seven Day PJM Load Projections and Constraint Forecast Information • Fixed Transmission Rights (FTRs)

  7. PJM Dispatch Rates

  8. PJM LMP Prices and Operational Data

  9. OASIS Main

  10. PJM Manuals / Reference • PJM Tariff • CBM Practices - Man. 2: Transmission Service Request • Regional Practices / Business Rules • OASIS User Guide • NERC Tagging - Priority Codes Job Aid • OASIS Timing Requirements Job Aid • PJM Company Transmission Provider Information • Confirmed Reservations as of 03/09/2005

  11. OASIS Transmission Service

  12. Display ATC • Discounts • Transaction Information • Energy Scheduled • Security • PJM Info • Post/Read Messages • Company Information • User Information OASIS Application Login

  13. OASIS Transaction Information

  14. eData Real-time Data

  15. eData

  16. eData

  17. eData • Preferred Layout • My eData • Energy Contracts • eSuite • IRC Report • Constraints • Activity Log • Announcements • Emergency Messages