1 / 23

Government of Karnataka

Government of Karnataka. BANGALORE METROPOLITON REGIONAL DEVELOPMENT AUTHORITY. BANGALORE METROPOLITON REGIONAL DEVELOPMENT AUTHORITY. Presentation on. Satellite Towns Ring Road, Intermediate Ring Road, Radial Roads & Townships. in. Bangalore Metropolitan Region. June 2006.

vasanti
Télécharger la présentation

Government of Karnataka

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Government of Karnataka BANGALORE METROPOLITON REGIONAL DEVELOPMENT AUTHORITY BANGALORE METROPOLITON REGIONAL DEVELOPMENT AUTHORITY Presentation on Satellite Towns Ring Road, Intermediate Ring Road, Radial Roads & Townships in Bangalore Metropolitan Region June 2006

  2. BMRDA Projects BMRDA Proposes development of Trunk Road Network & Five Townships in BMR Region : • BMR – Satellite Town Ring Roads : • Connecting Towns located around Bangalore City • BMR – Intermediate Ring Roads : • Connecting Industrial & Residential Developments located around Bangalore City • BMR – Radial Roads : • Radiating from Bangalore City Connecting BMR – Satellite Town Ring Roads & BMR – Intermediate Ring Roads • BMR – Townships : • Five Townships are proposed around Bangalore

  3. Salient Features of BMR – Ring Roads • The Bangalore Metropolitan Region – Intermediate Ring Road & Satellite Ring Road are proposed for integrated and comprehensive traffic flow with National Highways, State Highways, Major District Roads & Ring Roads. • It is a 180 Km/hr High Speed Corridor with adequate traffic and road safety provisions. • Geometrical improvements to existing alignment are proposed, such as improvements to horizontal & vertical curves in the BMR-Ring Roads. • Grade separators & Interchanges are proposed at the junction of National Highways, State Highways & Major District Roads. • Two lane service roads 7.5M on either side are proposed for catering to domestic traffic.

  4. Salient Features of BMR – Ring Roads • Eco-friendly Multipurpose barrage- cum- bridges are proposed in the Bangalore Metropolitan Region- Ring Roads (at Ramanagara & Kanakapura area) • All towns are proposed for bypass. The Bypass roads are integrated with NH bypasses, SH bypasses & town Ring Roads, etc. • The width of the median proposed is 10M to 15M BMR-Ring Roads, in order to provide Metro/Mono Rail in course of time. • Multi Level & eco-friendly avenue plantations are proposed on Medians and on either sides of Ring Roads, to protect the environment. • Provisions are made for carrying utilities, OFC Cables, Sanitary Line, Telephone Cables, Electric Cables etc. • The total length of BMR –Ringroads is 784 kms: Initially 4 lane & upgraded to 8 lane road. • The estimated cost is Rs. 2650 crore (as per IRC specifications).

  5. Length & Area details of BMR – Ring Roads

  6. General Details of Satellite Towns Ring Road

  7. General Details of Intermediate Ring Road

  8. General Details of Radial Roads

  9. Survey work for BMR – Ring Roads in • progress to be completed by end Oct 2006 • A Transparent process of inviting Global Bids to be adopted for selection of private partner / developer.

  10. BMRDA Townships

  11. Salient Features of BMRDA Townships : • BMRDA TOWNSHIPS are independent, self-contained & eco-friendly integrated townships. • BMRDA TOWNSHIPS incorporate industrial & residential establishments, promoting work - home culture. • BMRDA TOWNSHIPS are connected by BMR Ring Roads & with a proper access to NH, SH, Railway Stations & Airport. • BMRDA TOWNSHIPS will have independent Air-strips & Helipads in 100 acres of land, to cater to limited domestic air traffic needs.

  12. Salient Features of BMRDA Townships : • Recreational facilities - Golf Course, Club houses, Malls. • BMRDA TOWNSHIPS are eco-friendly : forest, lakes & tanks, natural valleys, hillocks etc., are protected, preserved & developed. • BMRDA TOWNSHIPS have wide internal road network, with power, water supply, sanitation, etc. • Speciality : (a) Waste water recycling & (b) Solid waste management.

  13. Salient Features of BMRDA Townships : • Bidadi, Ramanagar & Sathanur townships located on southern Bangalore will have access to BMICP corridor through Bidadi, Ramanagara & Channapatna interchange • BMRDA TOWNSHIPS have complete provision for health, education, tourism & recreation. • BMRDA TOWNSHIPS are proposed in the limits of 85 villages having 79,000 population. These villages will be adopted by BMRDA for integrated & comprehensive development.

  14. Salient Features of BMRDA Townships : • BMRDA will also take up the integrated & comprehensive development of towns located on BMR Ring Roads & BMRDA Townships out of revenue generated from Townships Projects • Water Supply : Rejuvenation of Tanks, Rainwater harvesting, Recycling • BWSSB : would provide minimum [per capita 70 lpd] potable water. Additional requirements to be met by ground water / recycling. • Power Supply : would be arranged by KPTCL

  15. STRR,IRR,Radial Ring Road&BMRDATOWNSHIPS

  16. BMRDA Townships – Land proposed to be acquired [In Acres] [Note:- I Acre = 4040 Sq. Mtrs]

  17. BMRDA Townships - Utilization of Land • 50% of the area is proposed to be utilized for open spaces and civic amenities like Roads, Parks, Playgrounds etc • Balance 50% of the area is proposed to be parceled out into large plots of 50 / 100 / 200 acres etc for further development into residential / commercial & industrial zones through multiple secondary developers

  18. Approach First project at Bidadi through bid route & other projects through SPV [Public Private Partnership] mode Lands would be acquired initially through KIADB & later by BMRDA itself Aim : Development of integrated work & live infrastructure and not merely creating plots Master Plan to be prepared by Private Partner / SPV BMRDA shall provide handholding assistance for obtaining the approvals of the various regulatory authorities

  19. Approach Thematic townships Alternative modes of compensation to land losers would also be explored The Private Partner shall finance & develop the entire internal project infrastructure including for water and power supply BMRDA shall provide external infrastructure including access roads, water & power up to the periphery through BWSSB and KEB (KPTCL) BMRDA shall provide bulk solid waste management facility outside the township

  20. Approach Selection of the Private Partner through open global tendering process Foreign firms to participate either through an Indian subsidiary or through a JV/Consortium with Indian firms and would be subject to the relevant FDI norms/regulations Private Partner shall welcome monitoring of project progress by BMRDA to ensure compliance with the project objectives Project Implementation Period is expected to be 2 years and Realisation Period, 5 years

  21. Approach • BMRDA shall use the surplus generated from the Township Project for development of BMR Region through projects for :- • Development of road / metro / mono rail networks etc • Development of the existing towns and villages falling within the project area and its immediate surroundings • Greening of the BMR

  22. Phasing of the Projects • First Township at Bidadi • Ramanagara, Sathanur, Solur and Nandagudi to be takenup thereafter in phases

  23. Thank You

More Related