1 / 12

OBAN Open Broadband Access Networks IST 6FP Contract No 001889 Deliverable D2 Project Presentation

OBAN Open Broadband Access Networks IST 6FP Contract No 001889 Deliverable D2 Project Presentation. OBAN Public document. OBAN in brief. Duration: 3 years 2004/1 – 2006/12 Budget/EC cont: 11/5 M€ 14 partners coordinated by Telenor

vernon-kidd
Télécharger la présentation

OBAN Open Broadband Access Networks IST 6FP Contract No 001889 Deliverable D2 Project Presentation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. OBANOpen Broadband Access NetworksIST 6FP Contract No 001889Deliverable D2Project Presentation OBAN Public document

  2. OBAN in brief Duration: 3 years 2004/1 – 2006/12 Budget/EC cont: 11/5 M€ 14 partners coordinated by Telenor • 4 telecom operators (Telenor, Telefonica, Swisscom, France Telecom) • 6 industrial partners(Lucent(NL), Birdstep(N), ObexCode(N), Motorola(I), EuroConcepts(I), Lucent(UK) • 3 univercities/institutes Sintef(N), Techn. Univ. Berlin(D), ISMB(I) • 1 national telecom regulatorNPT(N) D2 Project Presentation

  3. IST Programme organisation • OBAN Project Officer • Over-all project policies • Resource commitments • Technical and administrative decisions with external impacts EC GA TMC PM WP0 PAS • Resource utilisation • Techn & admin decisions with WP impact • Technical decisions within the activities WP1 WP2 WP3 WP4 WP5 WP6 A1.1.. A2.1.. A3.1.. A4.1.. A5.1.. A6.1.. Project administration D2 Project Presentation

  4. WP6Dissemination of results WP1 Scenario & requirements WP0 Project Management To all WPs WP2 OAN Architecture WP3 Prototyping & integration WP4 Network Coverage WP5 Society aspects Workpackages and their interrelations D2 Project Presentation

  5. Main objective By-passing user To explore how a high performance broadband mobile networkbased upon inexpensive wireless LAN technology and unused capacity in the fixed access networks can be established D2 Project Presentation

  6. Rational behind • Most users will in few years have broadband access over the fixed network • The capacity of these access line is poorly exploited • Wireless LAN technology is getting popular as the dominant home networking technology. • Wireless LANs have large capacity and are often poorly exploited • OBAN intends to investigate how the public can obtain access to these resources and what kind of services can be provided over this network. D2 Project Presentation

  7. No of base stations >100 000 (Norway) GSM 1 2 4G UMTS Rational behind (cont’d) Coverage per base station in mobile networks: • GSM (14 kb/s) - 50 km2 (r < 4 km) • UMTS1 (384 kb/s) - 3 km2 (r < 1 km) • UMTS2 (2 Mb/s) - 1 km2 (r < 600 m) • 4G (< 20 Mb/s) - 0,03 km2 (r < 100 m) The high number of base stations in broadband mobile networks requires a new broadband infrastructure to feed all base stations. The required invest-ments will therefore be extremely high. The OBAN project introduces an alternative way to achieve the same, but at much lower cost. D2 Project Presentation

  8. Areas of foci toreach the main objective Security: because we are opening up today’s privately disposed access lines and wireless LANs for public use Mobility: because we need to know what degree of mobility can be provided in areas of randomly located WLAN access points connected over the fixed networks access lines QoS: because we want to know how to provide QoS to users in a heterogeneous network composed by technologies with limited QoS abilities D2 Project Presentation

  9. Areas of foci toreach the main objective 3G/B3G to explore and evaluate how the OBAN concept can be integrated with the 3G/B3G visions. Coverage: to estimate potential coverage and capacity of an OBAN network. Smart antennas are investigated in order to improve network performance Commercial: to investigate how the OBAN concept may be utilised commercially and how legal and regulatory issues may affect deployment in large scale D2 Project Presentation

  10. Areas of foci toreach the main objective The RG is the key component in the system and need extensive investigation through implementation to verify the concept D2 Project Presentation

  11. ..the wireless RG.. ..a key component in the concept Local traffic (inhouse and external) GSM, UMTS, …. Broadband access line (xDSL) wRG Guest Open Access capacity D2 Project Presentation

  12. Contact information Coordinator: Telenor R&D Snarøyveien 30, N-1331 Fornebu, Norway +47 6789 0000 Project manager: Einar Edvardsen +47 915 29029 einar-paul.edvardsen@ telenor.com URL: www.ist-oban.org D2 Project Presentation

More Related