An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SAN, Blade, VM Ware Larry M. Gerlt A+, CNE 3, MCSE 4, CCNA

  2. Overview • SAN and Blades • Advantages • Disadvantage • Who Mosaic chose and Why • VM Ware • Advantages/Uses • Disadvantages/Non-Uses

  3. Advantages - Why Use a SAN • Data Safety • Lost 3 hard drives in one weekend. • Had only one hot spare • Did not lose any data • Disk Space Utilization • Pockets of Space on various Server Raids • Seldom had free space where needed • On a SAN you grow the volume as needed

  4. SAN Disadvantages • Initial Investment • Cost of SAN • Cost of Fiber cards for servers • Cost of Fiber switches • Single Point of failure

  5. SAN Risk Management SPOF • Dual Cisco fiber switches • Dual fiber cards for production servers • Latest iteration – boot from SAN

  6. XioTech Features • Standard SAN features • Redundant Power Supplies • Raid 1, 5, 10 • Central Management • Can define selected disk(s) for • Separate disk space pool • Limiting to specific users

  7. XioTech Features • Unique to XioTech • Change Raid configuration on-the-fly • Upgrade to larger drives one drive at a time • Mix and match drives without having separate pockets of space • Survive multiple simultaneous hard drive failures

  8. Blade Server Advantages • Minimal Rack Space • Reduced power consumption • Ability to reboot “hung” server remotely • Ability to remotely totally down a server and then bring back up. • Central Management console

  9. Blade Server Disadvantages • Initial Investment • We needed to purchase 7 servers to reach a break even point verses buying 1 U servers • Purchasing more servers than fit in one Blade Center • Again face cost deficit unless buying 7 or more servers

  10. IBM Blades • 14 server slots per blade center • Only vender offering quad processor servers when we purchased • Quad proc. Servers require 2 slots • Single or dual fiber port fiber card • Single or dual port NICs • On board CDRom and floppy • Fit in standard Computer Cabinet

  11. Oma LAN COS LAN Mosaic, Omaha CoSentry, Bel. Top Routers - Out to Internet Solid lines = TCP/IP Dashed Lines = Fiber Dotted Line – SAN Repl. via private line San w/backup & Mag Classic server – Oma San with Mag 3D and prod RA data - COS Router Router N/W Switch N/W Switch Pix 515 Firewall Pix 520 Firewall N/W Switch N/W Switch Server Server Fiber Switch Fiber Switch SAN SAN Fiber Switch Fiber Switch N/W Switch N/W Switch

  12. VM Ware Advantages • Server Consolidation • Multiple servers on one • Totally separate virtual server environment for applications that do not “play well with others.” • Reduced overall Hardware costs • DRBC • Can have backup copy of a server • Can drag & drop to other hardware running VM Ware

  13. VM Ware Advantages (2) • Reduced new server build time • Can have a generic server to copy for new servers • Reduced Console requirements • 1 server connected to KB/Mouse/Monitor switch • Multiple servers managed on single server

  14. VM Ware Disadvantages • Initial Hardware Cost • Requires beefed up server • Lots of Ram • More disk space • Dual processor – prefer quad • NIC Overload • Must choose application servers that do not require 100% of NIC (may use second NIC)

  15. VM Ware Disadvantages • Processor overload • Do not recommend for memory and processor intensive applications (SQL or other data base server

  16. Summary • SANs, Blades, & VM Ware: • Improved disk space utilization • Increased DRBC • ROI for hardware $ spent