1 / 14

Mantoloking & Super Storm Sandy

Mantoloking & Super Storm Sandy. Update #3. Mantoloking & Super Storm Sandy. AGENDA : Overview Current Status Short-Term Plan Long-Term Plan Resources. 2. Mantoloking & Super Storm Sandy – Current Status. INFRASTRUCTURE: STATE DOT Project : Finished

vidal
Télécharger la présentation

Mantoloking & Super Storm Sandy

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Mantoloking & Super Storm Sandy Update #3

  2. Mantoloking & Super Storm Sandy • AGENDA: • Overview • Current Status • Short-Term Plan • Long-Term Plan • Resources 2

  3. Mantoloking & Super Storm Sandy – Current Status • INFRASTRUCTURE: • STATE DOT Project: • Finished • Working traffic light on Herbert • Guardrails in place • Sidewalks, curbs, grass (!?!)

  4. Mantoloking & Super Storm Sandy – Current Status • INFRASTRUCTURE: • DEBRIS REMOVAL: • 26,000 tons to date • Continuous • Private Property Debris Removal (including demolition) under discussion • with FEMA. • SAND REMOVAL/RE-USE: • Army Corps dredging Lyman • Temporary sifting station will be in place immediately after dredge work is complete.

  5. Mantoloking & Super Storm Sandy – Short-Term Plan • Access: • New Access System in place • Priority: First Responders / Residents • Contractors next

  6. Mantoloking & Super Storm Sandy – Short-Term Plan • Administration: • Tax reassessment- Complete assessment by Property by March, 2013 • Prepare for Reconstruction: Planning Board considering new zoning req’s based on revised elevation guidelines from FEMA (issued last week) • Streamline permit process • Planning Board working with Borough: Resolution being drafted allowing: PODs, RVs, Boats, etc.

  7. Mantoloking & Super Storm Sandy • UTILITIES (Current Status): • Sanitary Sewer • Over 15,000 lf (3 miles) of sewer main cleaned and inspected • Force main pressurized and discharging clean water to OCUA • Water • 90% of main restoration complete • Pressure testing and water quality testing for 8” main on Rt. 35 • Gas • 70% of main restoration complete • Portion of Barnegat Lane and Lagoon/Channel not pressurized • Electric • 85% of distribution grid energized • Areas around Barnegat Lane and Herbert St breach not energized 7

  8. Mantoloking & Super Storm Sandy • UTILITIES (Short Term Planning): • Sanitary Sewer • Complete the remainder of sewer main CCTV inspection/cleaning • Install temporary pump system at Herbert Street • Water • Repair damaged fire hydrants • Install new services for properties off of new 8” main in Rt 35 • Gas • Pressurize and perform full assessment of Lagoon/Channel area • Replace 2” main on Barnegat Lane • Electric • Complete the replacement of overhead distribution • Ensure safety policies remain in place throughout restoration work

  9. Mantoloking & Super Storm Sandy – Happy Holidays

More Related