1 / 20

Learning Objectives

Learning Objectives. LO5 Document an accounting system to identify key controls and weaknesses in order to assess control risk. LO6 Write key control tests for an audit program.

vidar
Télécharger la présentation

Learning Objectives

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Learning Objectives LO5 Document an accounting system to identify key controls and weaknesses in order to assess control risk. LO6 Write key control tests for an audit program. LO7 Outline the auditor’s responsibility when internal control evaluation work detects or indicates a significant control deficiency or a high risk of fraudulent misstatement.

  2. Application Control Activities Specific procedures used in each accounting process to meet the relevant control objectives. LO5

  3. Documentation of Control Elements Documentation of the control structure shows the audit team’s understanding of internal controls and the basis of decisions reached. • A number of tools are available to the auditor for documentation: • internal control questionnaires, • formal interview using a checklist, • narratives, and • flowcharts. LO5

  4. Internal Control Questionnaire (ICQ) and Narrative The most efficient means of gathering evidence about internal control is to conduct a formal interview with knowledgeable managers. • The ICQ is a form of checklist covering the control objectives. • Use of an ICQ assists the auditor in covering all the important points. • An ICQ is designed so that a response of “no” typically indicates a control weakness. LO5

  5. Accounting and Control System Flowcharts A picture is worth a thousand words. • Flowcharts can enhance auditors’ evaluations and updating a flow chart is relatively easy. • Initial preparation of a flow chart is time consuming. In some cases, control conscious businesses will have already prepared the flow charts. LO5

  6. Flowchart Guidelines • Standardized flow chart symbols should be used. • Flowcharts should be drawn with a ruler and template, or by computer software. • The flowchart should progress from top to bottom, from left to right wherever possible. • All relevant information should be on the flowchart, including explanations. • Columns can be used for the various departments to demonstrate segregation of responsibilities. LO5

  7. Stopping Risk Assessment Work Auditors may decide to stop evaluation work in Phase 1 for two reasons: • Control is too poor to justify reliance. • Control risk is set at maximum. • Goal is audit effectiveness. • Cost/benefit of reliance is not justified, although control is good. • Goal is audit efficiency. LO5

  8. Phase 2 – Assessing the Control Risk Following Phase 1, the auditor should make a preliminary assessment of control risk. This involves: • identifying specific control objectives, • identifying points in the flow of transactions where misstatements could occur, • identifying specific control procedures in place, • identifying the control procedures that must function to prevent or detect the misstatements, and • evaluating the design of control procedures to determine if it will be effective to test these controls. LO5

  9. Assessing the Control Risk A useful assessment technique is to analyze control strengths and weaknesses. • Strengths are controls that should prevent, detect, or correct errors. Control strengths will be further tested. • Weaknesses are the lack of controls that would allow material misstatements to get by undetected. • A bridge working paper can be used to connect the control evaluation to subsequent procedures. LO5

  10. Control Risk in Complex IT and Ecommerce Environments Business Internet and IT use have an impact on control risk. • Many business models incorporate the Internet. • Auditors are concerned with the security of IT processing LO5

  11. Ecommerce Control Aspects For an auditee that engages in ecommerce, the following aspects of internal control are particularly relevant: • Security • Transaction integrity • Process alignment LO5

  12. Security External access to the auditee’s information system though the internet creates security risks. • Control environment should address this increased risk. LO5

  13. Transaction Integrity Risks related to the recording and processing of ecommerce transactions include the completeness, accuracy, timeliness, and authorization of information in the financial records. • Control activities related to transaction integrity are required. LO5

  14. Process Alignment Process alignment refers to the integration of IT systems so that they operate as one system. • Control objectives for manual and IT-based systems are the same. • The points in the system where misstatements might occur are at input, processing, and output. LO5

  15. Input Inputs include: • Activities related to source data preparation. • Manual procedures applied to source data. • Source data are converted into computer-readable form. • Input files are identified for use in processing. LO5

  16. Processing Processing activities include: • Information being transferred from one program to another. • Computer –readable files are used to supply additional information. • Transactions are initiated by the computer LO5

  17. Output Output activities include: • Output files are created / master files are updated. • Master files are changed outside the normal flow of transactions. • Output reports or files are produced. • Errors identified by control procedures are corrected. LO5

  18. Manual and IT Controls over Information Processing Use of IT systems for financial reporting will include manual elements. • Controls over manual processed also need to be considered. LO5

  19. Assessing the Control Risk The information gathered about the client’s control environment, the accounting system and the control procedures should enable the auditor to reach one of three conclusions. • The auditor is required to make the control evaluation for classes of transactions and account balances at the assertion level. • Control risk for some assertions regarding a given balance might be low, and for other assertions regarding the same balance, the control risk might be high. LO5

  20. Phase 2 - Conclusions • Control risk may be assessed low, and it seems efficient and cost-effective to test controls leading to a combined approach. • Control risk may be assessed low, but it would not be cost-effective or efficient to test those controls. Substantive procedures will provide evidence cheaper than a combined approach. • Control risk is assessed high, the auditor will concentrate on substantive procedures and not test controls. LO5

More Related