1 / 5

Fort Nelson Progress Pictures Week 16

Fort Nelson Progress Pictures Week 16. Shuttering completed from C6 – C8 and wall poured on Friday 26/11/10. Fort Nelson Progress Pictures. Steelwork installed to tapered wall and foundation for flank wall 4 and starter bars. Fort Nelson Progress Pictures.

viet
Télécharger la présentation

Fort Nelson Progress Pictures Week 16

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Fort Nelson Progress Pictures Week 16 • Shuttering completed from C6 – C8 and wall poured on Friday 26/11/10

  2. Fort Nelson Progress Pictures • Steelwork installed to tapered wall and foundation for flank wall 4 and starter bars.

  3. Fort Nelson Progress Pictures • Gas meter house demolished, foundation excavated from C1 – C5 and 50% blinded, 3no column bases excavated

  4. Fort Nelson Progress Pictures Water tank downstand beams poured, tanks sanded up and insulation and volclay installed.

  5. Fort Nelson Progress Pictures 2no underpins excavated and poured.

More Related