1 / 7

Input to Strategy currently planned

Input to Strategy currently planned . Volume 3 (need a short version less than 15 pages) - will refer to volumes 1 and 2 of course Make case for what is needed short term (towards 2020 – next step beyond CTF3)

viola
Télécharger la présentation

Input to Strategy currently planned

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Input to Strategy currently planned • Volume 3 (need a short version less than 15 pages) - will refer to volumes 1 and 2 of course • Make case for what is needed short term (towards 2020 – next step beyond CTF3) • Have agreement with ILC to provide a document with the physics case for a linear collider (international committee led by F. Le Diberder) • agreed in ILCSC/IFCA meeting in Mumbai, discussed more in LCWS2011 in Granada • James Wells CERN is in the committee • A document about a low energy machine - klystron powered with CLIC type of structures (will not be a CLIC input but we could participate) … debated and not concluded in most recent CLIC Steering Committee • CERN will prepare documents about medical use of accelerators and general accelerator R&D (input from us)

  2. CLIC project time-line • From 2016 – Project Implementation phase, including an initial project to lay the grounds for full construction: • CLIC 0 – a significant part of the drive beam facility: prototypes of hardware components at real frequency, final validation of drive beam quality/main beam emittance preservation, facility for reception tests – and part of the final project) • Finalization of the CLIC technical design, taking into account the results of technical studies done in the previous phase, and final energy staging scenario based on the LHC Physics results, which should be fully available by the time • Further industrialization and pre-series production of large series components for validation facilities • Other system studies addressing luminosity issues (emittance conservation) … • Environmental Impact Study • Final CLIC CDR and • feasibility established, also input for the Eur. Strategy Update 2012 - 2016 ~ 2020 onwards 2016 – 2022 2004 - 2012 • 2011-2016 – Goal: Develop a project implementation plan for a Linear Collider: • Addressing the key physics goals as emerging from the LHC data • With a well-defined scope (i.e. technical implementation and operation model, • energy and luminosity), cost and schedule • With a solid technical basis for the key elements of the machine and detector • Including the necessary preparation for siting the machine • Within a project governance structure as defined with international partners CLIC project construction – in stages, making use of CLIC 0

  3. System test and initial step for CLIC • Objectives beyond 2016: • Final components at some scale • Full currents • Needed for initial phase of project (receptions and conditioning of final modules before installation) • Other users of such a facility ? • Expensive wrt to current LC funding at CERN (~390 MCHf)

  4. Tentative beam parameters Drive beam (TBA entrance) Energy 480 MeV Emittance, norm. rms ≤ 150 um Energy spread, rms ~ 1 % Bunch length, rms 1 mm (3.6 ps) Bunch charge 8.4 nC Pulse Current 101 A (4.2 A in DBA) Pulse length 244 ns (~ 6 us in DBA, option for full pulse length – 140 us) Rep. Rate 50 Hz Probe beam (end of TBA) Energy 6.5 – 6.75 GeV (250 to 500 MeV injector exit, 6.25 GeV acceleration) Emittance, norm. rms1 – 20 um (both horizontal and vertical) Energy spread, rms 0.1 – 1 % Bunch length, rms ~ 0.5 mm (1.8 ps – may changed by adding a bunch compressor) Bunch charge 0.2 - 1 nC Pulse Current 0.4 – 2 A Pulse length up to 156 ns (possibility of single bunch) Rep. Rate up to 50 Hz

  5. Tunnel implementations (laser straight) Central MDI & Interaction Region

  6. Summary continued • Technical progress on accelerator and detectors good (CDRs will be substantial documents) • ILC TDRs/DBSs will also be done with CERN involvement (see later) • Plans for 2012-16 well underway for CLIC, and organization also ok (with some challenges) • Inside CERN and with collaborators (not obvious balance) • For accelerator (collaboration) and detectors & physics (less formal document and organization with set of institutes), with common Steering Group • Visibility at strategy/council level would help (in particular collaborators) • Plans 2016-2020(2) require more resources (CLIC zero face value is ~390 MCHF) • Relatively easy to plan in isolation but uncertainties from LC international development, and other possible priorities for CERN • Significantly more work is needed to define an optimal programme beyond the one now covering to 2016 (examples: review CLIC zero scope, possible other uses of the facility, other key tests – at CERN or elsewhere) • We can integrate into the future LC organization (in agreement with CERN Council documents for global projects) • With some challenges in some areas as indicated (European position should be better defined – but not always a clear opinion)

  7. Strategy for the strategy • What is needed to conserve a leading European role in a future LC project (purely my view): • Funding at MTP level as a minimum for next phase + “moral” boost to potential collaborators in the next 2-4 years (flag in Strategy/Council as strategically important) …. but have clear potential to involve collaborators better and improve project substantially with more resources • Planning beyond 2016 at an increased level (at CERN and partners), with four elements: • CLIC larger systemtest(s) • ILC hub at CERN – prepare/study • Lead European LC Detector and Physics activities (establish much better links to HL and HE LHC physics studies and strengthen all) • Increased strategic involvement by Council (read CERN management/strategy secretariat) in the European LC activities (it is now beyond RECFAs role) • Results: • Keep the LC options open the next 5-7 years at least if needed, it is an ambitious programme that attract partners (existing and new) inside the CERN organisation and outside, we conserve the CLIC development (at least in this period and with a planned next phase), we conserve/improve physics/detector studies for our future programme, and will allow us to react to international LC developments and LHC physics at the right time (hosting a LC or participating or none of them) • Perspective (at stake): • A LC (CLIC certainly but also ILC) is likely to be the future “world machine” as LHC is today, provided LHC (including HL LHC) unveils some of the new physics believed to be within reach • It will extend any labs programme (and certainly CERNs) VERY substantially in time and scope as an LC extendable in both length and acceleration technique/technology • It can support a very large user community as its physics programme is wide • HeLHC has some of the same potential but here CERN is “the host” so the short term strategy is easy

More Related