GTR for motorcycle braking

GTR for motorcycle braking. Preliminary report from the Informal group 56/GRRF, 2004/09/21. Motorcycle GTR: background (1). 1998 Global Agreement – IMMA priorities 46/GRRF (Sept 1999): project introduced 51/GRRF: IMMA presented severity comparison + outline of GTR

visser
Télécharger la présentation

GTR for motorcycle braking

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. GTR for motorcycle braking Preliminary report from the Informal group 56/GRRF, 2004/09/21

  2. Motorcycle GTR: background (1) • 1998 Global Agreement – IMMA priorities • 46/GRRF (Sept 1999): project introduced • 51/GRRF: IMMA presented severity comparison + outline of GTR • September 2002: Canada becomes the GTR sponsor • June 2003: Informal group set up

  3. Motorcycle GTR: background (2) • Group Members: Canada, USA, Italy, Japan, India, IMMA and FEMA • July 2003: 1st Informal group meeting • April 2004: 2nd Informal group meeting • Sept 2004: Preliminary report to GRRF • November 2004: Preliminary report to AC3

  4. Regulations considered • ECE R78 • USA FMVSS 122 • Japan’s JSS 12-61 • General agreement between IMMA and USA/Canada severity assessments • 2nd Informal group (April 2004) meeting able to agree the technical basis for the GTR and to appoint a drafting group

  5. The technical basis: general • Based on: • the results of the severity comparison • experience with repeatablity/practicality • a combination of concepts in: • ECE R78 • FMVSS 122 • JSS 12-61

  6. The technical basis: tests • Dry stop test: • Laden: single brake tests following R78 • Unladen: both brakes together, 100 km/h, following FMVSS • High speed test: from 160 km/h, to meet 5,8 m/s2 following JSS and FMVSS • Heat fade test: following R78 • Wet test: following R78

  7. Next steps • 17h45 tonight: GTR text group meets • 2004/11/08-10: 3rd Informal group meeting in Montreal, to: • Review phase 2 of the USA/Canadian testing • Discuss progress with the GTR text • Discuss the basis for the cost/effectiveness analysis

  8. Future schedule • 57/GRRF: presentation of the detailed table of technical proposals: discussion/agreement (working version already on the UN website) • 58/GRRF: if there is agreement at 57/GRRF, presentation of the draft GTR text • Cost/effectiveness study by 2005/12/31 • After approval of the GTR text by GRRF: preparation of the official technical report and final GTR text for AC3 and presentation in 2006