1 / 10

BIVŠA VIŠA DJEVOJAČKA ŠKOLA U MOSTARU

BIVŠA VIŠA DJEVOJAČKA ŠKOLA U MOSTARU. THE FORMER GIRLS’ HIGH SCHOOL IN MOSTAR. Grad Mostar City of Mostar Zavod za prostorno uređenje The spatial development institute.

wan
Télécharger la présentation

BIVŠA VIŠA DJEVOJAČKA ŠKOLA U MOSTARU

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BIVŠA VIŠA DJEVOJAČKA ŠKOLA U MOSTARU THE FORMER GIRLS’ HIGH SCHOOLIN MOSTAR Grad Mostar City of Mostar Zavod za prostorno uređenje The spatial development institute ZAVOD ZA PROSTORNO UREĐENJE, 88000 Mostar, Ul.H.Repca bb; Tel. 036 581 135; Fax: 036 581 134; e-mail: gmprostor@bih.net.ba

  2. BIVŠA VIŠA DJEVOJAČKA ŠKOLA U MOSTARU /THE FORMER GIRLS’ HIGH SCHOOLIN MOSTAR LOKACIJA PROJEKTA PROJECT LOCATION

  3. BIVŠA VIŠA DJEVOJAČKA ŠKOLA U MOSTARU/THE FORMER GIRLS’ HIGH SCHOOLIN MOSTAR Foto-montaža obnovljenog i transformisanog kompleksa sa postojecom okolinom Photo-montage of the restored andconverted complex in its existing surroundings

  4. BIVŠA VIŠA DJEVOJAČKA ŠKOLA U MOSTARU/THE FORMER GIRLS’ HIGH SCHOOLIN MOSTAR PLANOVI I FASADE PLANS AND FACADES

  5. U SKLOPU BIVŠE VIŠE DJEVOJAČKE ŠKOLE U MOSTARU PREDVIĐENI SU SLIJEDEĆI SADRŽAJI: • Garaža (150 vozila) 4446,5 m2 • Komercijalni 3413,5m2 • Hotel 1732,8m2 • Uredi 1136,9m2 • Sale 2061,0m2 • Rekreacija 1199,3 m2 • Ukupno: 13990,0 m2 In adition to these objects, THE FORMER GIRLS’ HIGH SCHOOLIN MOSTARis planned to provide following services: • Garage (150 cars) 4446,5 m2 • Commercial 3413,5 m2 • Hotel 1732,8 m2 • Offices 1136,9 m2 • Halls 2061,0 m2 • Recreation areas 1199,3 m2 • Total : 13990,0 m2

  6. Procjena investicije / Investment cost approximation PredraČun troškova ulaganja (sve izraženo u BAM) • Pripremni radovi 418.200 • Zemljani radovi 469.165 • Betonski radovi 3.434.700 • Zidarski radovi 818.564 • Grubi stolarski radovi 120.000 • Postavljanje krova 284.000 • Hidroizolacija 256.136 • Fasadni radovi 610.000 • Grubi metalni radovi (ploče) 95.000 • Ostali metalni radovi 125.000 • Fini stolarski radovi 512.680 • Keramičarski radovi 180.000 • Kameni radovi 811.840 • Postavljanje podova 240.000 • Gipsani radovi 60.000 • Farbanje 60.000 • Metalni krovovi 145.000 • Stakleni radovi 125.000 • Voda i kanalizacija 287.591 • Električne instalacije 2.500.000 • Postavljanje bazena 120.000 • Liftovi 620.000 • Klima uređaji 2.357.000 UKUPNO 14.649.876 Estimated Investment Costs (all in KM) • Preparation work 418.200 • Soil work 469.165 • Concrete work 3.434.700 • Masonry 818.564 • Carpenter work 120.000 • Roong 284.000 • Hydro isolation 256.136 • Work on facades 610.000 • Sheet-metal work 95.000 • Other-metal work 125.000 • Joinery 512.680 • Ceramics 180.000 • Stonework 811.840 • Flooring 240.000 • Gypsum work 60.000 • Paintings 60.000 • Metal roofs 145.000 • Glass work 125.000 • Water and sewage 287.591 • Electrical installation 2.500.000 • Pool installation 120.000 • Elevators 620.000 • Air condition 2.357.000 Total 14.649.876

  7. Aproksimativni troškovi pripreme za investiranje / Initial costs for investment • PROSJEČNA CIJENA GRAĐEVINSKOG ZEMLJIŠTA II ZONA ............................................................. – 20,78 KM/m2 • NAKNADA ZA POGODNOST RENTA II ZONA (KORISNA POVRŠINA OBJEKTA) ............................................................. – 57,72 KM/m2 • NAKNADA ZA UREĐENJE GRAĐEVINSKOG ZEMLJIŠTA U OBUHVATU OVOG PLANA IZNOSI APROKSIMATIVNO (KORISNE POVRŠINE OBJEKTA) ............................................................. KM/m2 NAPOMENA: U GORE NAVEDENIM IZNOSIMA NISU URAČUNATI TROŠKOVI SLIJEDEĆIH STAVKI: • IZRADA PROJEKTNE DOKUMENTACIJE, • ADMINISTRATIVNE TAKSE I NAKNADE ZA IZGRADNJU SKLONIŠTA (1% OD PREDRAČUNSKE VRIJEDNOSTI OBJEKATA). • AVERAGE PRICE OF BUILDING LAND, ZONE II .......................................................... – 20,78 KM/m2 • FEES FOR AMENITIES FEES ZONE II (NETTO BUILDING AREA) .......................................................... – 57,72 KM/m2 • URBAN PLANNING FEES AFFECTED BY THIS PROJECT .......................................................... KM/m2 NOTE: THE ABOVE FEES DOES NOT INCLUDE COSTS OF THE FOLLOWING: • PREPARATION OF PROJECT DOCUMENTATION • ADMINISTRATIVE FEES AND FEES FOR THE CONSTRUCTION OF BOMB SHELTERS REQUIRED BY LAW (1% OF THE ESTIMATE VALUE OF BUILDINGS).

  8. EKONOMSKA OPRAVDANOST PROJEKTA / THE ECONOMIC VIABILITY OF THE PROJECT

  9. BIVŠA VIŠA DJEVOJAČKA ŠKOLA U MOSTARU/THE FORMER GIRLS’ HIGH SCHOOLIN MOSTAR

  10. BIVŠA VIŠA DJEVOJAČKA ŠKOLA U MOSTARU/THE FORMER GIRLS’ HIGH SCHOOLIN MOSTAR

More Related