An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Minimum short circuit power in the LV distribution network to meet EN 50160 standard requirements David MEZERA david.mezera@eon.cz Martin KAŠPÍREK martin.kaspirek@eon.cz E.ON Czech Republic – Czech Republic

  2. The sources of this survey This investigation was done on the basis of: • 8 years experience of PQ measurement • Evaluated over 3000 measurements PQ in the LV network • The LV network contains of • 18.005 MV/LV distribution substation [piece] • 21.660 LV cable underground line [km] • 17.151 LV overhead line [km] Real LV network was monitored for a long time on 3.000 different PCC

  3. The final result of 3.000 measurements PQ

  4. Who is responsible? • DNO • Pure network=low short circuit power (Sk)? • Badly connected customers? • Customers • Using of nonstandard apparatus? • Electric apparatus?

  5. Minimum short circuit power LV • Thanks to IEC 725 wecan set the reference impedance value, or more precisely, a relative short circuit power value for the LV distribution network and electric equipment of nominal current less than 16/75 A

  6. Relation:short circuit power X PQ

  7. Relation:short circuit power X PQ

  8. Relation:short circuit power X PQ

  9. Relation:short circuit power X PQ

  10. Conclusions for DNO • To connect the new appliances according to Sk in the LV network • To increase Sk above minimum Sk 760 kVA, (900 kVA is recommended for today real used electric appliances) • To increase the cross-section of existing LV overhead lines • To build new MV/LV substations

  11. To increase the cross-section of the existing LV overhead lines To increase the cross-section of the existing LV overhead lines not realizable

  12. To build new MV/LV substations The final calculation is: • 54% new substations. This accounts for a construction of 9723 new substations, including transformers and MV connection with approximate total investment cost of: EUR 280 million.

  13. Conclusion • The pure PQ in LV network is caused by poor conditions on both sides, DNO and customer. • Solution on the side of DNO is calculated on 280million EUR. • Solution on the side of customers ??