An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PUMP STATIONELECTRICAL DESIGN 40 Years Lessons Learned Maynard Wayne Robertson, PE, CEM mwrobertson@vaughnmelton.com mwrdcr@comcast.net TAUD Technology Conference Gatlinburg, TN March 13, 2013

  2. Pump Station Design Requirements • Tennessee Dept. Environment & Conservation • Environmental Protection Agency • NFPA- 70- National Electrical Code • Tennessee Fire Marshall- Electrical Inspections • OSHA/TOSHA

  3. TDEC Requirements • General Design Requirements for Sewerage Works • Key Chapters for Pump Stations; 1, 2, 14 • Chapter 2. Section 2.5 Pump Stations • Alarm System and totalizers on All stations • 2.6.3 All wet well wiring to be Class l, Division l, per NEC • 2.7.3 PS Capacity Greater Than - 1.0 MGD Requires Flow Meters Requires Back Up Power System

  4. TDEC Requirements • Chapter 2.6.1.6 Requires to comply with All OSHA Rules. Work place safety. • Chapter 2.7- Operability/ Reliability Do you need generator/backup power? Essentially EPA requirements. • Reliability Class 1, Class 2, Class 3.

  5. TDEC • 2.5 Septicity Controls. I guess something that smells BAD. Do not make it smell worse. Setting controls for minimum time in wet well. • Auto Pump Out (Timed pump start after low level contact made, low cost to reduce odor ) • Electric Power Systems Chapter 1.3.11.5 • www.tn.gov/envionment/wpc/publications • Design Criteria for Sewerage Works

  6. National Electrical Code • Latest Version NEC-2011 • Next Version NEC-2014 • Code revised on Three Year Cycle • Version adopted in Tennessee NEC-2008

  7. NFPA CHAPTER 70 • National Electric Code / 70E work place safety • NEC 2008 Used Statewide *Exceptions In Some Cities NEC-2011 • 70E Work Place General Safety Requirements • Installation Of Equipment • Protection Of Electrical Equipment

  8. NEC-2008Organization • Chapters: One thru Nine Articles Tables Appendix • Chapters: One Thru Four Basic Wiring Requirements. Apply to all Wiring Installations. • Chapters: Five thru Nine Special Conditions

  9. NEC Chapters • Chapter 1 – General • Chapter 2 – Wiring and Protection • Chapter 3- Wiring Methods and Materials • Chapter 4 – Equipment for General Use • Chapter 5 – Special Occupancies • Chapter 6 – Special Equipment • Chapter 7 – Special Conditions • Chapter 8 – Communications Systems(Stands alone) • Chapter 9 – Tables • Annex A thru H ; Informational Only

  10. Key NEC Articles for Sewer Pump Stations Articles: 200, 215, 220, 240, 250, 310, 312, Table 310.16, 400, 430, 445, 500 & 700. Note: Entire Code Applies Always!!

  11. Tennessee State Fire Marshall • Requires Electrical Inspection of all New and Modified Electrical Installations. • Require Use of Listed Equipment- UL, etc. • Current Enforcement NEC -2008 • Authority Having Jurisdiction

  12. EPA • EPA-430-99-74-001 Operability and Reliability • Class 1 Standby Power nearly always required • Class 2 Standby Power maybe Required • Class 3 Normally not Required

  13. Service Terms • Service • Service Entrance • Metering • Service Disconnect • Service Type Overhead Underground • Single or Three Phase • Available fault Current

  14. NEC Voltage • Low Voltage = Less Than 600 Volts • Single Phase 120/240 Volts Motors 5 HP or Less( 7.5 & 10.0 are manufactured) • Three Phase 120/240 Volt Delta Connected 120/208 Volt Wye Connected 277/480 Volt Wye connected

  15. Electrical Service Entrance • Capacity for both pumps to operate • Service disconnect rated for service entrance and capacity to allow second motor to start without tripping • Service Equipment( Main Breaker and panel boards, etc.) rated for available fault current • Fault Currents can be high at PS as result of large transformer and short wire runs • Standard Interrupting capacity: 10,000, 22,000, 65,000amps • Grounding and Bonding • Adequate work space in front of electrical equipment • For outdoor locations shield panels from sun and heat

  16. Wiring Methods • NEC Article 250 Grounding and Bonding • Table 250.122 Size of Equipment Ground Conductor • Grounded Conductor • Ground Wire • Lightning protection • Table 310.16 /Table 310.15B(2)a, more than 3 conductors in raceway/conduit • Conductors Rated at 75C • Conductors Rated for Wet Location

  17. Control Panels • Correct NEMA Enclosure ( 3R, 4X, etc. ) • Ventilation/Cooling • Drains • Labeled (UL, CSA) • Alarms • Control Transformer (Reduce line Noise) • Instrumentation (Runtime, Volts, Amps, Calibration)

  18. Motor Starters • Manual • Across the Line starters( NEMA SIZE 0, 1, 2, etc.) • Part winding • Auto transformer • Soft Start • VFD (6 pulse more noise and 12 pulse less noise) • VFD noise may interfere with controls/SCADA

  19. PHASE CONVERSION • Single Phase Power to 3 Phase Power • Phase Conversion Using VFD • Size VFD Based On Single Phase Load Plus 15% 20Hp, 3P, 230V, FLA=54 Amp Based on single phase = 100 Amp Use 120 Amp VFD

  20. Common WWPS Problems • Corrosion, Corrosion, Corrosion!!!! • Electrical Junction Boxes in Wet Wells • Excessive Pumps starts/ Short run time • Unlisted Electrical Equipment (Inspector Rejects) • FAILURE TO DERATE CONDUCTORS in Conduit. (more than three) • Lack of Phase Loss Protection • Phase to Phase Voltage/excessive voltage difference. • Poor Electrical Grounding • No Isolation of sewer gas from control Panels thru use of junction boxes with double conduit seals. Complete failure less than 1 year. • Circuit Breakers too small, Result excessive heat in Panel.

  21. Common WWPS Problems • NO Conduit Seals, Sewer Gas direct line to control Panel. • Pump Rotation • Wrong NEMA Class Enclosures • Low Equipment Electrical withstand Ratings. • VFD noise on Control circuits • No GFIC Receptacles • Generators/ transfer switches improperly wired/ Phase Reversed.

  22. Checklist/Records • Always use startup Checklist • Voltage, Line to Line, Line to Ground, Phase to Phase • Amperes • Discharge Head • Pumping Rate • Photos • Nameplate Data • Terminals Tight

  23. WWPS Life Cycle Cost • Initial Cost • Installation • Commissioning Cost • Maintenance and Repairs Cost • ENERGY COST 90 PERCENT OF TOTAL • High Efficiency Motors • High Efficiency Pumps

  24. Generators • Correctly Sized to start second pump with all loads energized • Portable /Permanent • Transfer switches/ Manual or automatic • Fuels/ Diesel, Natural Gas, Propane, Gasoline. • Long Term maintenance cost

  25. PUMP STATIONELECTRICAL DESIGN 40 Years Lessons Learned Maynard Wayne Robertson, PE, CEM mwrobertson@vaughnmelton.com mwrdcr@comcast.net TAUD Technology Conference Gatlinburg, TN March 13, 2013