1 / 19

WP9 ANALYSIS from 1/10/2006 to 30/09/2007 FIRST ANNUAL MEETING

WP9 ANALYSIS from 1/10/2006 to 30/09/2007 FIRST ANNUAL MEETING. The main goal of WP9 is to promote the transmission of project information to the general public, local communities, relevant regional and national institutions as well as civil protection agencies.

webb
Télécharger la présentation

WP9 ANALYSIS from 1/10/2006 to 30/09/2007 FIRST ANNUAL MEETING

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WP9 ANALYSIS from 1/10/2006 to 30/09/2007 FIRST ANNUAL MEETING

  2. The main goal of WP9 is to promote the transmission of project information to the general public, local communities, relevant regional and national institutions as well as civil protection agencies.

  3. The Work Package will maximize the results of the project, in particular: • to raise awareness at the local, regional and inter-regional level about the need to carry out the integrated analysis of tsunamigenic structures and implementing a tsunami early warning system prototype • to favour the co-ordination between stake-holders, including civil protection agencies, and decision makers in implementing actions to increase preparedness and to reduce vulnerability.

  4. WP9 TASKS • Task 9.1 Project communication • Task 9.2 Project web site • Task 9.3 Contact database • Task 9.4 A dissemination plan

  5. Del. no. Deliverable name Delivery date (project month) D31 project brochure 6 D32 web site 1 D33 contact database (regularly updated throughout the project) 8 D34a D34b project information materials (initial, updates and final) current situation and know-how on tsunami and EWS 12, 24, 36 30 D35 periodical management reports D36 minutes of meetings and workshops Deliverable list

  6. Task 9.1 Project communication • A project communication image was elaborated, with a logo and a brochure in which are briefly summarized the objectives, the actions and the expected results of the project. Copy of this brochure is available also on the web and today will be distributed to all the present partners.

  7. Brochure Cover

  8. Brochure Inside

  9. Task 9.2 Project web site • The project web site, “nearest.bo.ismar.cnr.it”, was set up using an open source GNU licensed platform (PLONE) and is hosted by the ISMAR computer centre in Bologna. • The site contains basic information and status of the project, a description of the partners and related links, documents and reports on project meetings, news etc.

  10. The Web Site is divided in two areas with different characteristics: • a public section, accessible to every users, and • a private section fully open to all the project partners with the aim to assure co-ordination and retrieval of project information. Actually on the public section are available, to be downloaded, the project brochure and the NEAREST2007 cruise report.

  11. PUBLIC AREA PRIVATE AREA

  12. The next goals will be to complete the web site with following sections that are under construction: - a list of mutual related links to web sites of interest; - the completion of the public section in which the results of the project, tailored to inform non-specialists and the general public, will be downloadable; - a photo/movie section;

  13. Task 9.3 Contact database • The contact database is not yet fully completed and actually include a list of portuguese, spanish and italian people, institutions and journals that could be sensible to the hazard warning. • This database has to be upgraded and we ask to the partner an active contribute.

  14. Task 9.4 Dissemination plan • This task foreseen the using of different communication means as newsletters, electronic newsletters, regional and national press, radio / TV etc to reach the non scientific people. • In addition the diffusion plan include the presentation of the project activity in scientific meetings or congresses.

  15. Interview list • 17th August 2007 – Faro (Portugal) • Interview with Lusa- Agencia de Noticias de Portogal • 18th August 2007 - Faro (Portugal) • interview on portuguese TV TVI – Channel 4 • interview on portuguese TV RPT - Channel 1 • 29th August 2007 • interview with italian web newspaper AFFARI ITALIANI (www.affariitaliani.it) • 3rd September 2007 • radio interview on italian IsoRadio, la Pillola, • 9th September 2007 • Tv interview on italian Rai Uno - "Bit“ (www.bit.rai.it) • 13th September 2007 • interview on american web journal WIRED (www.wired.com) • And so on…

  16. Scientific Presentations and posters at International congresses and meetings • EGU General Assembly, Vienna, April 2007 • IUGG XXIV General Assembly, Perugia, July 2007 • Parteci pation to ESONET Meeting • Partecipation to TRANSFER Meeting

  17. In the meanwhile we have undertaken in the following activities: • Developing a relational database of geological and geophysical data (i.e. sub-bottom profiler segy data, MCS segy data, bathymetric data, navigation data etc.).Our goal will be to put this database accessible on the web site. • Organizing and mantaining an ftp site (ftp.ismar.bo.cnr.it) accessible by login and password in order to permit a sure exchange of big amount of geological/geophysical data among the project partners. • Urania 2007 cruise planning, developing and scientific reporting.

More Related