Lessons from Point 8 HW installation

Lessons from Point 8 HW installation. ?. Better idea of Where, When and … What !. Periodic meeting (every 2 weeks) - Good participation !. It’s not difficult to understand what one says. The problem comes from what one forgets to say.

wilda
Télécharger la présentation

Lessons from Point 8 HW installation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lessons from Point 8 HW installation ? Better idea of Where, When and … What ! Periodic meeting (every 2 weeks) - Good participation ! It’s not difficult to understand what one says. The problem comes from what one forgets to say.

  2. How to improve the installation process for the next steps? (1/2) Outside AB/CO By keeping close collaboration with: • TS/EL/CC for Cables installation (min. 3 months delay) • TS/EL/OF for Optical Fibers installation (min. 6 months delay) • TS/EL/WO & OMElectrical inst. & oper. BUT procedures are already well defined -> EXAMPLE ->

  3. How to improve the installation process for the next steps? (1/2) Outside AB/CO Cont. Example for TS/EL/CC: • DIC (Demande d’installation de câbles), date and delivery (min. 3 months) • Master planning and ‘Campagnes de câblage’ • ‘Réunion de coordination à court terme’ • Before launching the contract, direct call to the user for last modifications or green light!

  4. How to improve the installation process for the next steps? (1/2) Outside AB/CO Cont. Changes or enhancements foreseen from TS/EL/CC: • All racks are now installed and cables installation will not be postponed anymore. • TS/EL/CC will soon supply a new team (2 MY) for urgent or exceptional short time work (repairing, connectors, small cables, …) • Eventually: Fine tracking during each ‘campagne de câblage’ !?!?

  5. How to improve the installation process for the next steps? (1/2) Outside AB/CO Cont. Example TS/EL/WO & OM: The previous ‘consignes’ were: ‘Call us 2 weeks before you need your outlet running’. => Chaos ! Enhancement for electrical outlets: SOON ! • ‘Campagnes de mise en service’ per area (ARC, UA, RE, ..) • The user will choose his sockets on a TS/EL file

  6. How to improve the installation process for the next steps? (2/2) Inside AB/CO • By tracking all HW components: • Cables • Timing modules • Fieldbus components • By using a more accurate planning, including all phases (manufacturing, delivery, test, manpower, …) EXAMPLE

  7. How to improve the installation process for the next steps?(2/2 cont.) Inside AB/CO AB/CO/IS QUIZ FALSE TRUE A worldFip segment is: - a cable ? - a set of cables AND active components AND SW driver AND drop cables AND connectors AND …….. ??

  8. FipDiag Tap Tap Tap Tap SR8 configuration = 26 WorldFip segments !! FGC FGC FGC FGC FGC FGC FGC FGC WorldFip segment = … Gateway FipDiag Tap Tap Tap Tap FGC FGC FGC FGC FGC FGC FGC FGC

  9. Request from AB/CO to TS/IC To include a time slice, in the master schedule, for AB/CO test Which is not the case, now ! https://edms.cern.ch/file/102509/2.0/MasterSchedule-20-10.pdf

  10. Comments ?

  11. The next ‘short term’ steps are :

  12. LHC electrical circuits view

  13. http://ts-dep.web.cern.ch/ts-dep/groups/ce/lhc/DocPicures/PDF/LHCUnder.pdfhttp://ts-dep.web.cern.ch/ts-dep/groups/ce/lhc/DocPicures/PDF/LHCUnder.pdf

  14. HW installation: Planning 2005 • TS/IC master schedule: • https://edms.cern.ch/file/102509/2.0/MasterSchedule-20-10.pdf • RA83-UA83 towards Point 7 • Short Circuit Tests PO -> Q5 => July 2005 • Cryo Instrumentation => Sept. 2005 • QPS (LSS8L) => Sept. 2005 • Short Circuit Tests Q5-> Arc => Sept. 2005 • PIC => Sept. 2005 • Sect. 8-1 • QPS rack installation => 1st July 2005 • Cryo Instrumentation => Oct. 2005 • Short Circuit Tests => Dec. 2005 HOLIDAYS

  15. Comments ?