1 / 20

STATE of TECHNOLOGY

STATE of TECHNOLOGY. Sequim School District. External Connections. Connected to the State K20 Network Gigabet Ethernet Interface Current Contracted Rate is 100 Mb/s We routinely run at about 80 Mb/s Looking at increasing this capacity

winona
Télécharger la présentation

STATE of TECHNOLOGY

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. STATE of TECHNOLOGY Sequim School District

  2. External Connections • Connected to the State K20 Network • Gigabet Ethernet Interface • Current Contracted Rate is 100 Mb/s • We routinely run at about 80 Mb/s • Looking at increasing this capacity • Major analysis during upcoming SBAC and MSP Testing • E-rate funding as part of state consortium • Reduced fee structure this year

  3. INFRASTRUCTURE • Fiber backbone connects Haller, OPA, HS Library, H – Building, and New District Office with 10Gb Fiber • Fiber is distributed to HS Gym, HS Cafeteria, A, B, C, & E BLDG patch through the HS Library as an intermediatepoint @ 100 Mb fiber • Maintenance, Music Bldg, are connected by Copper • HS Portables – connected with Cat5 cabling • Alt Ed Classrooms and Ag building connected with 10 Mb Coax • Greywolf is connected via PUD fiber with 30 Mb. We are looking at increasing this if possible.

  4. INFRASTRUCTURE • Server room is located above the MDF in catwalk at Middle School • 4 Active Directory servers running Windows 2008(3) or 2012(1) • Provide file and print sharing services, for students and staff, run applications and SQL Databases for such services as library, HS & MS business offices, MAP Testing and other • - CoRaid Storage – Includes 18-2 Tb drives for backing up data

  5. INFRASTRUCTURE • Internal Connections Include • Fiber Patch Panels, 100 Mb Fiber Switches • HP Procurve, 24 Port Netgear, POE Switches • Assorted 8 port hubs in elementary classrooms • Electrical & Network Drops are limited through out the district. • Ranging from 2 electrical outlets and network drops per class room up to about 8 in some MS Classrooms • CAT5 Cabling runs throughout the district for network connectivity. • The new standard for cabling is CAT6 in order to maximize speed and capabilities of devices.

  6. Monitoring and Management Tools • Fortigate Firewall • LanSchool – Classroom Monitoring Software • DeepFreeze • Ninite Pro

  7. WIRELESS • Aruba System • 48 Access Points – Deployed through out District • 9 - 10 years old – running 802.11g • State of the art is “ac” provides Gb connectivity which is more than 10 times faster than “n”,@ 600-900 Mb’s • “g” provides about 54Mb’s. • Currently No Guest Access • Managed at the controller

  8. Operating Systems & Software • Running Windows 7 on all machines • Office 2010 Productivity Software – Will migrate to 2013 over summer • Moved to Office 365 for e-mail last year • Licensing for Operating Systems, Servers and Productivity Software is through EES • Pay for all employee workstations – Student Machines are at no cost

  9. Technology in the Classroom • All instructional spaces equipped with Document Cameras and Projectors • Document Camera’s and projectors were purchased as part of new curriculum adoptions by content area with the last major purchase being made in 2007 -2008 • Some replacements including those for the new OPA were purchased in 2012-2013 • The addition of the 30 Mimio Interactive systems in the district also introduced short –throw projectors allowing some reserves for replacement • Document camera replacements beginning last year have been through Issaquah @ $35 a piece (4 years old). • Older document cameras are not compatible with Mimio’s • Much of this technology is moving to HDMI connectivity

  10. Technology in the Classroom • K – 2 Classrooms have 4 student workstations – increased by 2 last year • 3 – 5 Classrooms have 6 student workstations • 6th Grade Classes – 4 student work stations (limited by number of drops in classroom) • 7th & 8th Grade Classes – 6 student work stations • Most HS Classrooms have 1 student work station for students to use to check grades on Skyward. • HS Science classrooms have 7 student work stations • HS – Senior English Classes have 8 – 16 Student work stations • HS – Study Skills classroom has 8 Student work stations, Special Services classrooms have 4 - 8 • Ag Science and Cooking classrooms have 6 student work stations.

  11. Student Technology Uses • IXL • MAP Testing • Mandated State and National Online Testing • Skyward - Student Access • All the Right Type • Destiny – Library Services • Accelerated Reader, STAR • Turnit – in – New to English Department • Moodle • Research and Presentations • Technology Skill Development

  12. Machines • Approximately 1500 Devices running on our network • 225 are Staff Machines – Approx 3-4 Yrs Old • 1275 Student Machines – Age ranges from 2 to 10 years old. • 500 Machines from Issaquah School District purchased @ $25 each – 4 years old • Replaced Computers 4 Kids Machines in MS and Elementary Schools

  13. Mobile Devices • 118 – Assorted iPads in the district • iPads are generally an unsupported device • Genesis into the district was through Rotary Grants for Special Services and PGP Plans by individual classroom teacher. • Elementary and HS each have 10 unit carts for LAP Math and Title Reading • All administrators have iPad to support the TPEP evaluation system for gathering evidence.

  14. K – 8 Computer LABS • HHE – 1 computer lab 28 work stations • GWE – 1 Computer lab 28 work stations • “Temporary” Lab installed in Sped Portable for SBAC testing • OPA – 1 Lab (Doubles as classroom) 14 stations expanded to 16 for SBAC testing • 16 station Laptop Cart (6 yrs Old – Limited batteries) • MS – 3 Labs (Library), 1 Classroom Lab, 16 station laptop cart for Robotics • “Temporary” Lab installed in library classroom for SBAC Testing

  15. HS Computer Labs • 3 Labs in Library -32 Machines in each lab • Newest machines in the District 2 years old • 2 – 16 station mobile laptop carts • 7 years old – Batteries limited • CTE Labs – 3 Business, 1 CAD Robotics, 1 Photography all 3 – 6 Years old • Alt Ed Classrooms – 8 Machines each classroom – 2 years old

  16. Technology Staff • District Desk Top Support – Richard Seiler • Data and Security Manager – Maria Seabolt • Computer Lab Managers and Support • Loretta Grant, Julie Dostie, John Morton • Network Support – 2 days/Week by ESD • School Librarians support labs in MS and HS • CTE – Support their own labs generally • Vanilla

  17. Budget • Technology MSOC Budget History 2010 – 2011 $178,000 2011 – 2012 $194,000 2012 – 2013 $194,000 2013 – 2014 $184,000 • Includes Software Licenses, Capitol Outlay, & Training, Subscriptions • Employee Costs and ESD Contracts are Additional

  18. Professional Development – Our Biggest Challenge • Limited • Time, Money, Expertise, Sustainability • Atomic Learning – Fall initiative

  19. Thank You Questions?

More Related