1 / 2

Dairyland Modernizes its EMS

Dairyland Modernizes its EMS. Establishing a New Application Infrastructure. Situation:

winston
Télécharger la présentation

Dairyland Modernizes its EMS

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Dairyland Modernizes its EMS Establishing a New Application Infrastructure Situation: Dairyland Power Cooperative has been providing reliable electricity for more than 58 years in a service area that encompasses 62 counties in five states (Wisconsin, Minnesota, Iowa, Illinois and Michigan). In late 2000, the generation and transmission cooperative, which provides the wholesale electrical requirements and other services for 25 electric distribution cooperatives and 18 municipal utilities, decided it was time to modernize its Energy Management System (EMS). Action: To that end, Dairyland contracted with Siemens to implement Spectrum PowerCC power transmission control system components. The overall strategy called for “establishing a new applications infrastructure” featuring key Spectrum PowerCC components without discarding Dairyland’s existing ARTECS II system (an earlier Siemens-supplied, mainframe-based EMS). Initially, four Spectrum PowerCC components have been integrated into the EMS, including ICCP (Inter-Control Center Protocol), a CIM-compliant Information Model Manager (IMM), a commercial RDMBS-based Historical Information System (HIS) and Energy Accounting (EA). The IMM, PowerCC’s data definition and maintenance tool, is being used to define all ICCP, HIS and EA data. The ICCP link provides the mechanism to transfer data from the ARTECS II EMS to the HIS and EA components. Results: For Dairyland, the result of all this has been easier sharing of HIS information across the enterprise, better integration between existing EMS-related applications, and lowered administrative and software maintenance costs. For the cooperatives and municipal utilities that Dairyland supports, and for the individual customers of those co-ops and munis, the solution means many more years of reliable electric service.

  2. Siemens Power Transmission & Distribution, Inc. Energy Management & Information Systems 7225 Northland Drive Brooklyn Park, MN 55428-1540 1730 Technology Drive San Jose, CA 95110-1365 Contact us by: Phone: (763) 536-4785 E-mail: ldewall@siemens-emis.com Siemens Power Transmission & Distribution The Intelligence to power your future. © 2001 Siemens Power Transmission & Distribution, Inc. All rights reserved.

More Related