COURSE CODE: WMA 413 COURSE TITLE: HYDRO-METEOROLOGICAL INSTRUMENTATION AND NETWORK DESIGN II NUMBER OF UNITS: 2 COURSE DURATION: TWO HOURS PER WEEK. COURSE COORDINATOR: DR. J. O. ADEJUWON E-MAIL: adejoseph2003@yahoo.com OFFICE LOCATION: ROOM B203, COLERM BUILDING

winter
Télécharger la présentation

COURSE COORDINATOR: DR. J. O. ADEJUWON E-MAIL: adejoseph2003@yahoo

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. COURSE CODE: WMA 413 COURSE TITLE: HYDRO-METEOROLOGICAL INSTRUMENTATION AND NETWORK DESIGN II NUMBER OF UNITS: 2 COURSE DURATION: TWO HOURS PER WEEK COURSE COORDINATOR: DR. J. O. ADEJUWON E-MAIL: adejoseph2003@yahoo.com OFFICE LOCATION: ROOM B203, COLERM BUILDING OTHER LECTURERS: DR. GRACE O. OLUWASANYA

  2. Course Contents • Water levels of rivers, lakes and reservoirs, Gauges and procedures for measurement of state. Frequency of gauge measurements. Discharge measurements: by current meter, float method, dilution method. Measurement of correspondence stage by moving boat method, Ultrasonic method, Electromagnetic method, Stream gauging stations. Purpose: selection of sites, control sections, Artificial controls, stage discharge relationships. Stream flow computation, computation of average gauges height, computation of average discharge, Quality control of stream flow data. • Sediment discharge: Measurement of suspended sediment discharge, Measurement of bed-sediment discharge. • Collection, processing and publication of data. Collection and observation procedures. Transmission of hydrological and meteorological observations. Quality control, storage and cataloging. Special data collection requirement: `bucket surveys`` of storm rainfall, weather radar data. Extreme stages and discharges. • Pre-requisite: WMA 313.

  3. Course Requirements • This is a compulsory course for students in the Department of Water Resources Management and Agrometeorology and the student must have passed WMA 313 before taking this course. As a school regulation, a minimum of 75% attendance is required of the students to enable him/her write the final examination

  4. Reading Lists • Ayoade, 2003: Tropical Hydrology and Water Resources, MacMillan, Nigeria, 276pp • A Textbook of hydrology and Water Resources

  5. 1.1 Introduction What is gauging? What is stream flow? What constitute stream flow? Stream flow measurement The common terms in stream flow measurement River or stream gauging; Hydrometry Water level/stage Discharge measurement Water level measurement Measurement of stream velocity Computation of discharge Stream gauging stations Site selection criteria River Gauging

  6. 1.2 Stage measurement Water levels of rivers, lakes and reservoirs Stage measuring instruments Staff gauges Manually operated weight/electric sensors Float operated stage gauges Depth sensors Procedures for stage measurement Frequency of stage measurements 1.3 Discharge measurement Velocity – Area method Control structures Dilution gauging River Gauging

  7. 1.3.1 Velocity – Area method Determination of cross-sectional area of stream Measuring velocity of flow Surface floats Current meters Types of meters Operational procedure Discharge computation Mean-section method Mid-section method Empirical equations Manning's’ formula Chezy’s formula River Gauging

  8. 1.3.2 The use of control structures Weirs ---Sharp crested ---Broad crested Flumes 1.3.3 Dilution gauging or tracer method Types of dilution gauging Constant rate injection method Integration or gulp method Characteristics of chemicals/tracers Examples of chemical used as tracers Condition for use of dilution gauging River Gauging

  9. 1.4 The use of control structures Weirs ---Sharp crested ---Broad crested Flumes 1.5 Stage –Discharge relationship Flow rating curve The rating equation Rating table River Gauging

  10. Measurement of sediment discharge • Suspended sediment discharge • Bed sediment discharge Sediment Discharge

  11. Collection and observation procedures • Transmission of hydrological and meteorological observations • Quality control • Storage and cataloguing • Special data collection requirements • ‘Bucket surveys’ of storm rainfall • Weather radar data • Extreme stages and discharges Collection, processing and publication of data