ISAS/JAXA Tracking station

ISAS/JAXA Tracking station. Usuda Deep Space Center. Diameter 10m AE 44% expected Feed & Receiver Ka-band Trx < 50K expected cooled LNA Tsys 140 K (fine condition). VSOP-2 Ground System (Based on halca method). Freq, Phase Controller. H-Maser. CMD/MON. 100MHz. 10MHz. 1PPS.

wynona
Télécharger la présentation

ISAS/JAXA Tracking station

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ISAS/JAXA Tracking station

  2. Usuda Deep Space Center • Diameter 10m • AE 44% expected • Feed & Receiver • Ka-band • Trx < 50K expected • cooled LNA • Tsys 140 K (fine condition)

  3. VSOP-2 Ground System (Based on halca method) Freq, Phase Controller H-Maser CMD/MON 100MHz 10MHz 1PPS Ether GP-IB 7,000MHz 7,000MHz 1100MHz 1,000MHz TX- AMP U/C U/C LO U/C O/E E/O 100MHz 100MHz (±2MHz) 5,900MHz 7,000MHz Freq, Phase Control LO DDS LO 400MHz 37.5 GHz 26,000MHz 40.0 GHz Feed DIP LO 100MHz 100MHz O/E E/O CLK GEN 100MHz (±2MHz) 26,000MHz 400MHz LO 4,500MHz OBS Simulator Freq, Phase Control LO DDS 6,500MHz Carrier track 100MHz 7,000MHz 7,000MHz 500 MHz 500MHz Ether LNA D/C E/O O/E D/C DEM PD Cooled VSI-H FMT Mark5B Network 1PPS Ether Software Spectro- scope PC FIFO Antenna Room Operation Center

  4. VSOP-2 Ground System (w/o Doppler Comp.) Freq, Phase Controller H-Maser CMD/MON 100MHz 10MHz 1PPS Ether GP-IB 7,000MHz TX- AMP 7,000MHz U/C LO O/E E/O 100MHz 7,000MHz LO 37.5 GHz 26,000MHz 40.0 GHz Feed DIP LO 100MHz O/E E/O 26,000MHz LO 4,500MHz OBS Simulator LO 6,500MHz 100MHz 7,000MHz 7,000MHz 500 MHz 500MHz Ether LNA D/C E/O O/E D/C DEM PD Cooled VSI-H FMT Mark5B Network 1PPS Ether Software Spectro- scope PC FIFO Antenna Room Operation Center

  5. Doppler compensation needed? • Related Matters • Band mismatch • PLL Loop stress • Phase characteristics of onboard instruments • Correlator capability • System construction cost

  6. Band mismatch • Doppler shift: ~1MHz (f=40GHz, rr=7km/s) • Band-mismatch: 126 MHz (128 – 2 MHz) • Degradation of SNR : 0.99 (√126/ 128)

  7. PLL Loop stress • Relation between Doppler rate and PLL : Natural angular frequency of second order loop(rad/sec) : Rate of change of angular frequency (rad/sec2) : Phase error of Phase Lock Loop, threshold ( ~12deg.)

  8. Phase characteristics of instruments • Phase fluctuation dφ by df : • Easy estimation • Hup(f)- Hdown(f)=2πfτ • Group delay characteristicsτ: ~1nsec • Phase fluctuation dφ ~0.36 deg (df~1MHz) • Phase characteristics measurements needed before launch

  9. Data Storage • Storage Terminal with VSI • Mark5B (Haystack) • K5-VSI (NiCT) • Clock fluctuation compensated by FIFO? • Corrlator interface • VLBA correlator Mark5 • ENV correlator Mark5 • EAVN* correlator Mark5, K5, VERA terminal *EAVN (East Asia VLBI Network)

  10. East Asia VLBI Network Correlator • Korea-Japan Joint VLBI Correlator (KJJVC) • KVN and NAOJ • KVN, VERA, JVN, VSOP-2 • Seoul • 16 stations • Data buffer • Data rate • Max. 8 Gbps/st

  11. Summary • UDSC 10m antenna is expected to VSOP-2 GTS • Doppler compensation system depends on cost. • Several VSI storages are available • Mark5B is better • for operational easiness at three correlators.