1 / 15

449 MHz Modular Wind Profiler

449 MHz Modular Wind Profiler. William Brown Atmospheric Profiling Group (ISS & GAUS) EOL / ISF. Brad Lindseth, Charlie Martin, Jen Standridge, Tim Lim, Lou Verstraete, Steve Cohn, Terry Hock EOL / ISF & CDS & DFS. With help from: Jim Jordan, Dan Law, Warner Ecklund ( NOAA)

Télécharger la présentation

449 MHz Modular Wind Profiler

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 449 MHz Modular Wind Profiler William Brown Atmospheric Profiling Group (ISS & GAUS) EOL / ISF Brad Lindseth, Charlie Martin, Jen Standridge, Tim Lim, Lou Verstraete, Steve Cohn, Terry Hock EOL / ISF & CDS & DFS With help from: Jim Jordan, Dan Law, Warner Ecklund (NOAA) Phil Chilson (OU), Zoya Popovic (CU) Plus others in the community EOL EAC 8 Nov 2012

  2. Current radar wind profilers • Four LAP3000 profilers • 915 MHz 400W • Boundary layer only • Mature technology • DBS Winds • 15 – 30 minutes Dynamo Project

  3. Typically deployed with Integrated Sounding System (ISS) Diego Garcia, BIOT Wind Profiler R/V Revelle Wind Profiler

  4. ISS Wind Profilers : 40+ projects • Wide range of science targets • But: • Inflexible • One size fits all Mobile ISS at PLOWS Toga-COARE IDASS Lantex Quad/MASS Reno-Basin LABEX ARM/OK Small-Cu/MS ACE-1 Flatland/LIFT Juneau BLX JETEX CASES-97&99 TOCS FASTEX Lake-ICE Forrest-ABL BAO Nauru-99 Atlas PROPHET Transitions VTMX ISPA FDI/JHU IMPROVE IHOP NAME SRP T-REX Metcrax Climode AHATS CPS PLOWS PCAPS DYNAMO DC3

  5. 449 MHz Modular Wind Profiler • Development to extend our wind profiler capabilities • Longer wavelength enables higher altitudes • Fast wind measurements (spaced antenna) • Modular to give more flexibility • Easy to deploy Hexagonal Module PCAPS Project

  6. Modularity 3-module system 2 kW amp Profiles through boundary layer 7-module system 8kW or 16kW amp Profile to mid-troposphere Eventually 19-module system 16kW or 32kW Full troposphere to UTLS

  7. Example: T-REX MISS ISS MAPR

  8. Winter cold pool, Salt Lake valley 3-panel PCAPS deployment 915 MHz 449 MHz

  9. 3-panel 449 MHz Comparison with 915 MHz • 2 months • Altitude coverage 500m – 1km greater • Median abs diff ~ 1.5 m/s Winds percentage vs. Height 449 915 High 915 Low

  10. 7-panel Latest developments Expansion to 7 panels So far using: 2 kW TX amp 3 channel data system

  11. 915 cf 7-panel 449 915MHz high mode 449MHz 7-panel 7-panel 449 typically seeing 1 – 2 km higher

  12. Rapid Winds Vertical velocity & 5 minute winds Note apparent waves

  13. Current Work • Completing 7-panel system: • 7-channel data system • Dual 8kW amplifiers • Upgraded front-end boxes • Mounting frame • Analyzing tests • Limitations: • Limited range resolution (~ 150m) • Processing and algorithms need work • Can see higher than 915s, but not low gates • Clutter, RFI & artifact rejection

  14. Next steps • RIM • Range IMaging • Enables improvement in range resolution • Small inter-pulse steps in wavelength • Aiming to go from 150 m down to < 50 m • Funds identified for RIM expert to visit next summer Improve processing Reduce lowest range gate Add diagnostics Mobile version (449 MISS) RASS (Radio Acoustic Sounding System)

  15. Summary • Prototype systems working well - Promising technology • Completing seven antenna modules • One 7-panel profiler OR two 3-panel systems(Two BL or one mid-troposphere profiler) • Adding power (16kW) and data channels (3->7) • Approx 4 FTE years effort (Eng, SWE, Techs, Scientists) • Next Steps • Test deployments : capabilities and limits • Adding RIM • RASS, diagnostics, Mobile, lower gates, processing • Three user proposals received already • Front-Porch, DEEPWAVE, PECAN • Longer term: • Ship operations • Full 19-module system