1 / 4

WIRE PROJECT POG Notes

WIRE PROJECT POG Notes. Spacing Is Critical!: Watch The Spacing On The POG To Assure Accuracy! If Needed, Page 2 Has Beam Heights As Measured From The Floor To Each Beam Beams: Be Sure That Base Beams Are Installed Where The POG Calls For Base Beams

xenon
Télécharger la présentation

WIRE PROJECT POG Notes

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WIRE PROJECT POG Notes • Spacing Is Critical!: • Watch The Spacing On The POG To Assure Accuracy! • If Needed, Page 2 Has Beam Heights As Measured From The Floor To Each Beam • Beams: • Be Sure That Base Beams Are Installed Where The POG Calls For Base Beams • Beam Size Is Important As Most Of These Bays Are Packed Tight. Be Sure To Use The Right Beam Sizes In The Right Locations/Bays Base Beam No Base Beam

  2. WIRE PROJECT POG’s & SPECIFIC BAY ID #’s Bay 1 – 44-008 Bay 2 – 44-010 Bay 3 – 44-012 Bay 4 – 44-011

  3. WIRE PROJECT POP • POP Is Basic……..Just Beam Labels • Be VERY Careful & VERY Specific That The POP Labels Are Installed Underneath The Correct Product! • Ask! Never Guess!

  4. WIRE PROJECT Buy Back There Is A Buy Back For Existing Product – More Info To Come There Is Also New Product – More Detail To Come Including Tracking

More Related