1 / 18

3M – Prairie du Chien 2013 SHWEC Internship Kara Klubertanz

3M – Prairie du Chien 2013 SHWEC Internship Kara Klubertanz. Outline. Sustainability Background (3P) Project Objectives Water Reduction Process A Process B Discharge Investigation Site Wide Water Management. Pollution Prevention Pays (3P).

xenos
Télécharger la présentation

3M – Prairie du Chien 2013 SHWEC Internship Kara Klubertanz

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 3M – Prairie du Chien 2013 SHWEC Internship Kara Klubertanz

  2. Outline • Sustainability Background (3P) • Project Objectives • Water Reduction • Process A • Process B • Discharge Investigation • Site Wide Water Management

  3. Pollution Prevention Pays (3P) • Pollution Prevention Pays (3P) program in 1975. • Goal - eliminate or reduce sources of pollution in 3M products and processes • 10,000 3p projects since 1975. • Prevented > 3.8 billion lbs of pollution • Saved > $1.7 billion in their first year.

  4. Project Objectives • Assess water management for potential reuse or reduction • Noncontact and contact cooling water • Main focus • Process A • Process B

  5. Water Reduction • Background • Two processes • Process A • Extrudes resin to form very thin nylon or polyester fibers • Process B • Extrudes resin to form vinyl or Nylon/polyester webbing material • Significant opportunity to improve water management

  6. Process A

  7. Process A • Current water usage • Extruder • 10 GPM • Quench Tanks • 1 tank = 6 GPM • All 8 tanks = 48 GPM • Each tank vol.= 45 Gal. • Orient Tank • Volume = 278 Gal.

  8. Process A • Suggestion • Reduce flow rate in Quench Tanks by 15% • Decrease each Quench Tank volume by 1/3 • Evaluate tank design

  9. Process A • Water Reduced • 2,003,136 gal/yr • CO2 Emission Reduction • 6.016 Tons CO2/yr • Cost Savings • $10,867/yr

  10. Process A • Potential future projects • Automatic valves • Reuse Quench Tank discharge to supply Orient Tank

  11. Process B

  12. Process B • Current water usage • Extruders • 44 GPM • Quench Tank • 6-12 GPM • Temperature dependent • 435 gallon tank

  13. Process B • Replace non-contact cooling water with an Air Cooled Oil Cooler • Cools oil in extruders • Implement in 4.5” extruder

  14. Process B – Heat Exchanger • Water Reduction • 6,082,560 gal/yr • CO2 Emission Reduction • 16.843 tons CO2/yr • Average Cost Savings • $10, 540/yr

  15. Discharge Investigation • Problem • 2Q water bill increased • Research Highlights • Discharge Monitoring Reports • Production Schedules • Inconsistent with chart recorder • Maintenance • Preparing Fire Water Tanks for inspection

  16. Discharge Investigation • Conclusion • Meter • Possible obstruction or mechanical upset • Evaluate data more frequently • Cost Savings • $43,181

  17. Site Wide Water Management • Accurately meter & evaluate usage • Improve as products and operations expand

  18. Thank you to all 3M-PdC employees and to SHWEC Special thanks to David Liebl and Mary Prisby

More Related