1 / 9

UK Rail Train Comms & RFID

UK Rail Train Comms & RFID. Tim Lane – Network Rail Telecoms. GSM-R On-Train Comms. Railway Drivers for GSM-R Capacity. All CSD for Foreseeable Future Route-Based Call Routing Multiple Parallel Rail Routes Criticality for Voice and ETCS Data Other critical apps such as shunting

xiu
Télécharger la présentation

UK Rail Train Comms & RFID

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. UK Rail TrainComms & RFID Tim Lane – Network Rail Telecoms

  2. GSM-R On-Train Comms

  3. Railway Drivers for GSM-R Capacity • All CSD for Foreseeable Future • Route-Based Call Routing • Multiple Parallel Rail Routes • Criticality for Voice and ETCS Data • Other critical apps such as shunting • Greater use of Group Call • Move Away from Copper Cables • Migration of data to GPRS

  4. Spectrum Migration

  5. Railways and RFID • Wagon Identification – EU 868MHz initiative • Freight Container Identification • Train running information granularity improvement • ETCS Train positioning enhancement • Selective door opening – UK trial 868MHz & 2.4GHz • Train consist capture • “Tail Light” inspection replacement • Infrastructure inspection evidence • Spares and stock control

  6. GSM-R EVC JRU DMI & Cab radio Tacho Balise reader Radar Axle counter Euro Balise RFID – ERTMS Evolution Actual Speed (150 Km/h) • 4.8kb/s Continuous Data. • GSM-R CSD Moving to GPRS. • Automatic Train Operation in Longer Term? Distance to End of MA (900 m) Maximum Speed (160 Km/h) Goal Speed (80 Km/h)

  7. SRD - Embankment Monitoring …also: Rail Temperature Leaf Fall Bridge "Bash" Points Condition Hot Axle Box Wheel Flat Cable Theft Pass of Brander Rock Fall 6 June 2010

  8. Railways need COTS Products Section number to go here

  9. Size of the Prize • Wagon AVI tags: 100,000s across Europe • Selective door opening tags: ~5,000 UK platforms • Selective door opening readers: – ~10,000 UK driving cabs. • Train positioning enhancement - ~35,000 UK signal sections • Railway Infrastructure Staff - 35,000 in UK • 37,000 Bridges • 450 Tunnels (>300km of 30,000km) • 20,000 Sets of Points • 7,000 Level Crossings

More Related