1 / 13

US 6, Broadway Viaduct

US 6, Broadway Viaduct. Steve D. Kathol, P.E., S.E. Project Overview. Iowa ABC Workshop, August 11-12, 2008 Des Moines, Iowa. Broadway Viaduct. US 6, Broadway Viaduct. Project Overview. 3- UPRR Tracks. Indian Creek (In Culvert- Historic Structure). Historic Structures. 1- CNIC Track.

yelena
Télécharger la présentation

US 6, Broadway Viaduct

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. US 6, Broadway Viaduct Steve D. Kathol, P.E., S.E. Project Overview Iowa ABC Workshop, August 11-12, 2008 Des Moines, Iowa

  2. Broadway Viaduct

  3. US 6, Broadway Viaduct Project Overview 3- UPRR Tracks Indian Creek (In Culvert- Historic Structure) Historic Structures 1- CNIC Track City Streets

  4. US 6, Broadway Viaduct Existing Viaduct Existing viaduct: built in 1955, 1394’ x 64’, 19-span steel I-beam plus cellular abutments

  5. US 6, Broadway Viaduct Traffic Phasing Detour Westbound Traffic 2-Lanes Eastbound Traffic

  6. US 6, Broadway Viaduct Proposed Plan and Section Light Wt. Fill W/ Retaining Walls at Ea. Approach Aesthetics- To Be Determined Iowa BTE Beams 4-Column Piers W/ Base Grouted Drilled Shafts

  7. US 6, Broadway Viaduct Construction Phasing

  8. US 6, Broadway Viaduct Construction Phasing

  9. US 6, Broadway Viaduct Construction Phasing

  10. US 6, Broadway Viaduct Construction Phasing

  11. US 6, Broadway Viaduct Construction Phasing

  12. US 6, Broadway Viaduct Bridge Cross-Section

  13. Broadway Viaduct Identify accelerated construction methods to complete each stage in one construction season Maintain two traffic lanes (staged construction) Avoid construction vibration Evaluate the use of light weight fill for approach fill Session Objectives

More Related