Status Report #7. Portable Solar Power Supply Team# 13 Eric Camacho John Michael McLeod Ky Dinhquoc Nguyen Kelechi (Kc) Nwogu 03/23/2011. A portable solar power supply that will use solar energy with a solar tracker to power AC and DC devices. Finalize design & order parts (by 1/22)

yin
Télécharger la présentation

Status Report #7

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Status Report #7 Portable Solar Power Supply Team# 13 Eric Camacho John Michael McLeod Ky Dinhquoc Nguyen Kelechi (Kc) Nwogu 03/23/2011

  2. A portable solar power supply that will use solar energy with a solar tracker to power AC and DC devices. • Finalize design & order parts (by 1/22) • Build inverters (by 2/7) • Program microcontroller and build prototype (by 3/15) • Build solar tracker (by 3/22) • Assembly entire circuit (by 3/29) • Test and make final adjustments (by 4/04) Need & Milestones

  3. Currently on testing phase for the inverters • DC/AC inverter (Tested, lacks power). • DC/DC inverter • USB (Tested, works). • Cigarette lighter (Tested, works). • Finished website. • 15W Monocrystalline Solar Panel • Downsized due to weight and size Recently Completed

  4. DC/AC Inverters • Needs more power. • Build user interface • Simplified from original design • Build solar tracker Ongoing/Pending Tasks

  5. Completion of solar tracker • Finalizing system control interface • Prototype final design • Testing • Final report Upcoming Tasks

  6. Block Diagram

  7. 01/22 01/25 03/01 03/25 04/15 Schedule 04/21

  8. Completed Completed Completed Schedule

  9. Completed Completed Currently