Calorimeter: Overview

Trig. sum. Bank 0. Calibration. electronics readout chain. SCA (48 deep). SCA (48 deep). x1. Filter/ Shaper. Output Buffer. Preamp/ Driver. SCA. BLS. x8. Calorimeter. SCA (48 deep). SCA (48 deep). Bank 1. Calorimeter: Overview. Ursula Bassler.

yori
Télécharger la présentation

Calorimeter: Overview

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Trig. sum Bank 0 Calibration electronics readout chain SCA (48 deep) SCA (48 deep) x1 Filter/ Shaper Output Buffer Preamp/ Driver SCA BLS x8 Calorimeter SCA (48 deep) SCA (48 deep) Bank 1 Calorimeter: Overview Ursula Bassler New Phenomena Meeting 10/11/01

  2. Problems during Post-Shutdown Data Taking • Problem with timing with respect to the beam. • Frequent failures of BLS (base line subtracter) power supplies. • Dead, noisy, hot electronics channels • Problems in understanding ADC to GeV conversion. New Phenomena Meeting 10/11/01

  3. Timing Studies: triple sampling • comparison of energies measured at the nominal BX,132ns earlier/later: • ratios allow to determine time offset • more precise timing from comparison with model signal • • time -1 0 +1 + 97 ns + 113 ns + 81 ns early/ nominal =0.64 =0.61 =0.39 =0.69 late/ nominal =1.04 =0.82 =0.77 =0.78 Mingcheng Gao Mingcheng Gao,. ColumbiaNew Phenomena Meeting 10/11/01

  4. BLS Power Supplies • Put Magnetic circuit breakers on all BLS supplies. • A total of 36 supplies (+spares) needs to be worked on. • 10 are already done. • We will finish this job in 3-4 weeks. New Phenomena Meeting 10/11/01

  5. Dead, Noisy and Hot Channels • Lot of bad electronics channels were replaced during past few months. • In particular during the supervised access of 2nd week of September ~ 400 bad channels were replaced. • Data taken after run ~131000 are the cleanest . • There is clear enthusiasm about reprocessing this data set with off-line hotcell killer (NADA) and corrected weight factor. • More Hot cells were found by shifter’s using Examines. • During Shutdown we plan to eradicate these. New Phenomena Meeting 10/11/01

  6. Dead, Noisy and Hot cells Replacing bad preamplifiers. New Phenomena Meeting 10/11/01

  7. Alan Stone New Phenomena Meeting 10/11/01

  8. using pulser with DAC=25k delay=0 • T&C: x889, BLS: Base-2ticks, ADC: 0-sign suppressed had channel em channel • ADC measurement: DAC=25k ADC counts: 6355 Ursula Bassler New Phenomena Meeting 10/11/01

  9. Scope Measurement • 1 em-channel (crate 8 ADC 6 BLS 0 Tower 3 Depth 3) Shaper Output for ReadOut PreAmp Input at BLS-card • DAC=25k shaper Output=2.2V  SCA (after gain selection) 1.1V • Electronics Design: 4V in SCA = 32000 Adc counts • estimation: 25k = 1.1V= 8800 Adc Counts New Phenomena Meeting 10/11/01

  10. This problem was later identified by Dean as 2 resistors on the BLS board put in the wrong order. • So all ADC to GeV conversion should be corrected by a factor of 1.4 New Phenomena Meeting 10/11/01

  11. Runs Database from August 7- October 4 is available at • \\D0server4\projects\CalorimeterElectronics\Tuts\Cal_Runs_databse\fpdb\cal.access • Please look at the data and give us feed-back for hotcells, dead regions or starange behaviours. New Phenomena Meeting 10/11/01