1 / 16

THEMIS MISSION PRE-SHIP REVIEW ESA C. Carlson, M. Ludlam, J. McFadden

THEMIS MISSION PRE-SHIP REVIEW ESA C. Carlson, M. Ludlam, J. McFadden University of California - Berkeley. Overview. Overview Instrument Status Problem Failure Reports Calibration Data. Instrument Status. All ESA instruments are fully functional

york
Télécharger la présentation

THEMIS MISSION PRE-SHIP REVIEW ESA C. Carlson, M. Ludlam, J. McFadden

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. THEMIS MISSION • PRE-SHIP REVIEW • ESA • C. Carlson, M. Ludlam, J. McFadden • University of California - Berkeley

  2. Overview • Overview • Instrument Status • Problem Failure Reports • Calibration Data

  3. Instrument Status • All ESA instruments are fully functional • There are no outstanding issues or problems for the ESA. • ESA survived the environmental tests and is ready for launch.

  4. Problem Failure Reports • 4 PFR’s raised since last review – all are GSE/script/commanding related – i.e. not instrument related. • PFR 212 – Radiation source not correctly installed during F3/F4 Probe Thermal Vacuum. • Source was installed the wrong way round. ESA HV check out was still possible without the source. Problem was corrected for the F5/F1 Thermal Vacuum test. CLOSED. • PFR 213 – No 459 (Electron Burst Rate) Data being received during functional test whilst in Thermal Vacuum. • Tracked down to a script error. Script corrected and re-run and verified that 459 was received. CLOSED. • PFR 214 – Readback problem with MCP Housekeeping. At nominal setting the MCP HV supply incorrectly read full scale. • Traced to a problem in the ITOS database calibration for this value. CLOSED. • PFR 220 – Energy tables not written correctly. • During the uploading of the tables there were some commanding issues with the probe. The script was re-run from the beginning and problem was corrected. Tables were not reloaded for a full thermal vacuum cycle and no data corruption was seen. CLOSED. • All previous ESA PFRs closed.

  5. ESA Energy-Angle Calibration

  6. ESA Energy-Angle Calibration

  7. ESA Concentricity Test

  8. ESA Geometric Factor test

  9. ESA MCP test

  10. ESA Sweep Calibration

  11. eESA LPT at JPL

  12. iESA LPT at JPL

  13. PFR 220 Data

  14. PFR 220 Data

  15. iESA HV at JPL

  16. eESA HV Ni63 at JPL

More Related