1 / 15

the impact of work study on productivity

the ways workstudy improves the productivity ..... in pakistan where workstudy used as a mean of enhancing the over all productivity ..!!!

Télécharger la présentation

the impact of work study on productivity

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. THE IMPACT OF WORK STUDY ON PRODUCTIVITY MOHAMMAD YOUNUS (O8IN70) DEPARTMENT OF INDUSTRIAL ENGINEERING AND MANAGEMENT MEHRAN UNIVERSITY OF ENGINEERING AND TECHNOLOGY , JAMSHORO SINDH PAKISTAN

  2. Contents INTRODUCTION TO WORK STUDY….. TECHNIQUES OF WORK STUDY ……… ROLE OF WORK STUDY IN INSUTRIES ….. INDUSTRIES ENGAGE IN THE WORK STUDY …. WORK STUDY LEADS TO SEPRATE INE FROM OTHERS…

  3. INTRODUCTION WHAT IS WORK STUDY ????? • Work study is old as an industry itself. • It is the management technique that investigate all the factor effecting the efficiency and economy of the organization in order to make improvement. • Work study is the mean of enhancing the (productivity) of the firm by elimination of waste and unnecessary operations, reducing cost, standardized the method and time for doing a task etc

  4. TECHNIQUES OF WORK STUDY • There are two techniques of work study .. • METHOD STUDY. • WORK MEASUREMENT.

  5. METHOD STUDY • Method study is the systematic recording and critical examination of existing method and propose the way of doing work. STANDARD METHOD SYSTEMATIC RECORDING CRITICAL EXAMINATION Process charts, Diagrams, Therbligs Improved performance

  6. WORK MEASUREMENT Work measurement is the application of techniques designed to establishing the time. Breaking down the job into elements and find out the time of each element. Various techniques such as, ANALYTICAL ESTIMATION PMTS WORK SAMPLING TIME STUDY.

  7. GRAPHICAL REPRESENTATION OF WORK STUDY METHOD STUDY Examining a job and Finding the most efficient method to perform it. WORK STUDY TIME STUDY Determining the time Necessary to perform a job And its elements. HIGHER PRODUCVITY

  8. ROLE OF WORK STUDY IN INDUSTRIES PRODUCTION QUALITY CONTROL • Standard methods. • Standard time. • Best way of doing a task. Quality control rely on time standards and process analysis WORK STUDY INDUSTRIAL RELATION SALES Product cost is largely a function of manufacturing methods and measurement control. Good labor relations result from equality wages based on work content.

  9. VEIWS OF INDUSTRIAL ENGINEER’S ABOUT WORK STUDY 75% 50% WORK STUDY 45% • This is a views of various graduates and undergraduates IN ENGINNEER’S

  10. INDUSTRIES ENGAGE IN WORK STUDY There are No. of industries either multi-national or national few of them are as follows …. MULTI-NATIONAL INDUSTRIES …!! NATIONAL INDUSTRIES….!!!

  11. How Work Study leads to separate the industrial engineering from other engineering and business aspects ????? Since , Work study System effectives

  12. Where as , Mechanical engineering DESIGNING ASPECTS Business Administration (i-e MBA’S ) Managing the non technical resources So neither MECHANICAL engineer nor any MBA can perform the work study !!!! Only INDUSTRIALengineer’s can done the work study for system effectiveness …!!!