An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The alternatives

  2. Transition Keynsham Energy Group A HydroelectricPower Schemefor Keynsham. Is it possible?

  3. What is a hydroelectric power scheme? • Uses water and gravity • Provides a large amount of electricity • Renewable • Sustainable

  4. Types of hydroelectric power schemes • 3 main types • Storage system – Dam creates a reservoir • Pumped storage schemes • Run of River (ROR) schemes In Keynsham we are suited to an ROR scheme

  5. Where can it go? 3 Possible sites: Albert Mill Memorial ParkKeynsham Weir Keynsham Weir – best current option

  6. What could it look like?

  7. How much electricity? Annual mean flow rate greater 20 m3/s* If we take 20 m3/s as the peak flow rate: • One turbine = 518 homes (1.96 M kWh per year) • Two turbines = 1,036 homes (3.92 M kWh per year) *Estimated figure only

  8. Who gets the electricity? • National grid • Energy supplier pay: - Fixed sum per kWh generated - Separate payment for exported to national grid • Payback in approx. 10 years

  9. Funding Cost: • Potentially between £300k* and £500k* Funding: • Bath and West Community Energy (BWCE) • Create a ‘Keynsham’ energy company - Community members become shareholders *Estimated figures only

  10. Next Steps • Engage • Community • Landowners • Weir/river owners • Environmental Agency • Feasibility study

  11. Thank you Further info: www.keynshamt.wordpress.com