1 / 10

ESE group meeting

ESE group meeting. Admin news. Regional secretariat in building 14 will be closed soon. Evelyne Dho will take over many of these functions for ESE She will for still some time be in Bat 4 – R – 43 She is also busy with many other things: LVPS, TWEPP, etc.

zahur
Télécharger la présentation

ESE group meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ESE group meeting

  2. Admin news • Regional secretariat in building 14 will be closed soon. • Evelyne Dho will take over many of these functions for ESE • She will for still some time be in Bat 4 – R – 43 • She is also busy with many other things: LVPS, TWEPP, etc. • For general admin issues first look on our admin web page: https://ph-dep-ese.web.cern.ch/ph-dep-ese/group_internal/support.html • Travel • You will kindly be requested to do as much as possible yourself: Identify flights & Hotels, Book yourself when ever possible via internet (credit card) and with Wagonlit. • Large conferences (TWEPP, NSS, RT, CHEP) organized by PH secretariat • Experiment meetings/weeks: When possible via experiment secretariats • Do not forget to fill in travel request before !. • Sick and home leave via Danielle Boonroyin PH secretariat • Small group Economa will be made when Evelyne moves to Bat14 • Printers (e.g. stock of toners) will be handled by Evelyne, when she moves to bat14 • Computer accounts for new arrivals: Evelyne • We count on you not to overload Evelyne. slide 2

  3. Relocation 14/13/11 • Advancing surely but slowly • Most people now installed in new offices • Except: EPOOL, LVPS and Evelyne • New key system (flat per floor) to be implemented ASAP • Labs: • Painted • New electricity installations nearly finished • New Lightning on-going. • Air-conditioning: Completely stalled !.We will have to move into labs before air-conditioning available.Final installation must be done very carefully !. • Electronics keys to be installed when available • SMD lab with ESD floor: Antoine Junique • Group mechanical workshop: Christophe Sigaud • EPOOL: Waiting for reception to be made • LVPS: Waiting for chilled water to be available • Printers per floor to the extent possible • Water fountains per section/floor (as tap water in this building is currently considered “not drinkable”) • Corridors and stairs • To be painted (new CERN standard color scheme) and new lights, at end of relocation • Frames for posters, etc. • No printers/cupboards/storage/etc. in corridors !. • Sanitary installations to be refurbished (but when and how ?) • Elevators planned be refurbished • Meeting rooms: • Hopes to get 14-4-2 assigned as small group meeting room • ME section has large room: 14-5-22 for internal meetings/trainings • 13-2-005: to be refurbished ? • TSO’s: • 14: David Porret • 11/12: Patrick Petit • 13 Maurice Glasser • Cellar of Bat 13 will be made into labs/storage according to our needs later • Please try to keep local Cafeteria alive, Otherwise it will close !. Part of pleasant working environment. • General coordination/monitoring of work for relocation: Patrick Petit • If you encounter problems contact: Patrick, section leader or me. Questions ?. WE WILL HAVE A GROUP DRINK WHEN FINALIZED slide 3

  4. Seminars • I need to plan new seminar period • Suggestions for subjects and speakers most welcome (I start to run dry of ideas !). • Suggestions for improvements/changes ?. slide 4

  5. Working groups, interface • High speed serial interconnects • Coordinated by Csaba Soos • Simulation tools, PCB design, Verification, etc. • Use of CAE tools • Coordinated by Alex Kluge • Initial mandate to get working full board simulation tools (LINUX) • Interface with EN-IC-DEM • Handling of “political interface” and what can be improved: Philippe Farthouat. • Assuring that designs given for layout are appropriate and what design rules to apply: Peter Lichard. • Pool instrument advisory panel. • Experts in different types of instrumentation • FPGA working group ? • Tools, IP blocks, Interfaces, embedded processors, Use in radiation , ?. • Interest for this also expressed from machine sector but when requesting real feedback on this I did not get useful information. • To be made or not ? (I think there is a need for this) • Other working groups, Interfaces ? . Across departments ?. • New crate standards • Power supplies and radiation tolerance • Radiation tolerance • Other ? slide 5

  6. Personnel changes • Retired: • Mike Letheren • Pierre Jarron • Erik Heijne • Serge Reynaud • Mike Burns • Bjorn Hallgren • Madelaine Znoy • Change of group: • Luciano Musa to ALICE, as vital for appropriate running of TPC • End of LD’s: • Philippe Fontaine • Paul Harwood • New LD’s: • Stefano Michelis: On-detector power • Vincent Bobillier: LVPS • Wojciech Bialas: Micro electronics and related CAE • Rafael Ballabriga: Medipix 3 • IC’s: • Xavier Llopart • Allain Guy • Csaba Soos • Vladimir Ryjov • Bertrand Smaniotto • New Fellows: • Sara Seif el Nasr: Versatile link • Mat Noy: NA62 GTK • Rui de Oliveira: GBT link chip • Jose de Cardoso: GBT • Lorenzo Pierobon: Tech IP, radtol • Karolina Poltorak: Tech IP, PLL • Students: • Sebastian Fenger: GBT test • Christian Fuentes: On-detector power • Victor Lorentzen: ATLAS roman pots • Filipe Pereira: ABCN+1 digital • Tuomas Poikela: LHCb Vertex • Daniele Felici: CMS track trigger • Lukas Perktold: TDC • Winnie Wong: Dose pix • Associates: • Maria Marra: PLL • ZhengweiGao : Pool + LVPS + experiments. slide 6

  7. MARS • MARS exercise coming to an end for this year. • Status of past objectives and definition of new work objectives for coming year extremely useful and important for us all. • This year is particular difficult for us to make what we think is a fair/correct step allocation/distribution with the rules that are enforced on us • 1 step: Meritorious (25%) • 2 steps: Particular meritorious (~50%) • 3 steps or more: (~25%) • Additional constraints • Career path and salary band changes requires 2 or more steps • In past few years some additional steps were available (e.g. LHC finalization steps and premiums) • In general we think everybody has delivered excellent work during the last year: A great THANKS for all your efforts and your contributions to make a nice work environment. slide 7

  8. PavolFoldes • Tragic ski accident after only 1 month with us. • Walking just outside marked slope at Les Gets • I kindly remind our young students to be careful when doing skiing, rafting, climbing, Paraglider, Diving, etc.An accident is never far away. • Please profit from the nice region and the fantastic things to see and do, BUT be careful (for yourself, family, friends, etc.) • Profit from CAF, CAS, CERN ski Club, Guides, etc. to do your favorite spare time activities with appropriate safety measures. slide 8

  9. Group picnic • We would like to organize a group picnic (lunch) during this spring/early summer. • Buffet Canadien • Location ?. • Place for 50 – 80 people • Not too far from CERN • Some kind of cover if possible • Proposals • Vallon de Allondon (two years ago) • Cabane des Bucherons, VersoixThanks to Francois for this nice proposal • Other ? • Weather: In case of really bad forecast the day before we may have to cancel. • Friday 12:00 – ~14:00, Date via coming Doodle poll slide 9

  10. Questions ? slide 10

More Related