Santa Cruz Bicycles. Santa Cruz Bicycles Introduction. Introduction. About the Company (from the company’s website): The produce mountain bikes. They are a 21 year old company started in started in 1993 Their first space was the size of a small car garage

zaria
Télécharger la présentation

Santa Cruz Bicycles

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Santa Cruz Bicycles

  2. Santa Cruz Bicycles Introduction Introduction

  3. About the Company (from the company’s website): • The produce mountain bikes. • They are a 21 year old company started in started in 1993 • Their first space was the size of a small car garage • It was located in a space in the Seabright Cannery, Santa Cruz California • Now they have larger facilities Introduction

  4. About the Products (from the company’s website): • First bike model formed the cornerstone of their philosophy of simply advanced • That model was the Tazmon with a single pivot duel suspension • They make 20 models now • Offer a full range of bicycles for women Introduction

  5. Why is it more about change management that software implementation? Question 1

  6. PLM is the key factor in its successful process redesign. • Santa Cruz used to apply computer-aided-design (CAD) software. • They spent about 7 months to develop a new design • if the design failed, whole company would restart the design, • Starting over is the only solution • This could waste money and time. The Old Way

  7. The design team found a PLM system • It helped them analyze and model capabilities in a much more robust manner. • The PLM systems are able to use some professional software • to track the whole design process. • Allowing the designer to make a change and adaption to the design model. The New PLM System

  8. In the CAD period • the manufacture always needed 28 months to produce a bike • but in the PLM period • it just needs 12 to 14 months. • Time is money! The Difference

  9. What outside factors had to come together for Santa Cruz Bicycles to be able to make the changes they did? Question 2

  10. VPP

  11. The Design Team

  12. New Outsourcing Strategy 13 months 28 months

  13. Why is it more about change management that software implementation? Question 3

  14. From CAD: • Computer-Aided-Design Management software • To PLC: • Product Life Cycle Management software Change

  15. VPP(Virtual Pivot Point) system failures • To find a way to go from design to prototype faster Motivation

  16. 7 months to develop a new design • If design failed, need start over • 7 hours to run a simulation • 28 months from design to shipping Before: CAD

  17. tracks all variables • easier to make adjustment • run simulation in minutes • 12 to 14 months from design to shipping After: PLM

  18. Save Time and finance • Less time: flexibility Improvement

  19. “Term management and change management are used almost synonymously in today’s business vocabulary.” -- Keri E. Pearlson Change

  20. Questions? Santa Cruz Bicycles