T1 ITB Status

T1 ITB Status. Phase 1“Proof of Concept” Field Test conducted McNary U9 Dec 14-16 05 Although limited operating range tested, results promising Continuous monitoring of unit to identify “steady- state” operation and when to log data Interfaces with GDACS (security issues)

zarola
Télécharger la présentation

T1 ITB Status

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. T1 ITB Status Phase 1“Proof of Concept” Field Test conducted McNary U9 Dec 14-16 05 Although limited operating range tested, results promising Continuous monitoring of unit to identify “steady- state” operation and when to log data Interfaces with GDACS (security issues) Numerous fixes & improvements identified Once corrected, “unattended and automatic” collection of data possible

  2. T1 ITB Phase 1 • Test to verify bugs have been corrected • Parallel to IH index testing Feb ’06 • Off-cam (Fixed Blade) testing of Kaplan unit should prove applicability of ITB to Francis unit • Testing @ IH in lieu of previously proposed CJ verification test

  3. Type 1 ITB Phase 2 • Procure non-GDACS ITB ~$12k • Procure additional GDACS ITB ~$12k • Demonstration Project Kaplan (GDACS): LGR 4-6 proposed site (FY07) • Demonstration project Francis (non-GDACS): Site tbd, DWO or CJ

  4. T1 Future Work • T1 Implementation into GDACS: - ITB source code availability - ITB long term maintenance - Develop code for GDACS Est. $850k next 3 yrs to develop

  5. T1 Future Work • W-K Rel Flow Signal into GDACS • X-ducers w/ automated flushing system on each unit • B1,B2, TD, JD, CJ, IH, LGR, LMO, LGO 97 Kaplan & 27 Francis installations • AF, Libby & Willamette Valley Projects • E&D FY06 • Implementation FY07 & FY08 • Develop new discharge tables

  6. Absolute Flow CJ & DWO • 2 units CJ, 3 units DWO currently installed • Flow value into GDACS • Decision on remaining units • Range of possibilities: • Acoustic flow meters on every unit $$$ • Gibson Test every unit $$$ • Acoustic flow single unit given family & index test remaining units of same family • DWO testing to verify method (3) • If successful, phased implementation at CJ

More Related