1 / 30

CMHA HOUSING CHOICE VOUCHER PROGRAM

CMHA HOUSING CHOICE VOUCHER PROGRAM . INSPECTIONS WORKSHOP July 27, 2012. Welcome & Introduction . Amy Waxman , Assistant Director of HCVP Terry Foster, Manager of Inspections Jermaine Burge, Inspection Coordinator Dorothy Noga McCarthy, Ombudsman . CMHA Inspection Checklist .

zavad
Télécharger la présentation

CMHA HOUSING CHOICE VOUCHER PROGRAM

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CMHA HOUSING CHOICE VOUCHER PROGRAM INSPECTIONS WORKSHOP July 27, 2012

  2. Welcome & Introduction • Amy Waxman , Assistant Director of HCVP • Terry Foster, Manager of Inspections • Jermaine Burge, Inspection Coordinator • Dorothy Noga McCarthy, Ombudsman

  3. CMHA Inspection Checklist • Where to find it • http://www.cmha.net/hcvp/hqsinspectionchecklist • Follow the link HQS Inspection Checklist • This is a mandatory HUD form

  4. Program Violations • IDENTIFYING THE VIOLATIONS • TIMELINE OF EVENTS • RESULTS • MAKING THE REPAIRS

  5. Emergency Violations List • A smoke detector that is missing, not working or not loud enough. • Kitchen range burners that do not ignite when the control knobs are turned to the “light” position without the use of an outside fire source. • A hazardous gas hook-up for a kitchen range, as evidenced by a strong gas smell. • No water

  6. Emergency Violations List cont… • No electricity • Sewer back-up • No Heat (during the period from October 15th to April 15th) • Gas leak • Unit not secure, including unlockable windows at a height within six feet of ground level and/or unit entry doors with missing or broken locks. • Anything deemed life-threatening

  7. Emergency Violations Timeline of Events Day 1 • HCVP receive notification and contact landlord and tenant, an HCVP inspector will return within 24hrs Day 2 • Landlord will receive notice of violations and HCVP Inspector will return within 24 hours, if violations are not corrected, the HAP will be abated Day 3 • Violations are still not corrected, the HAP contract will be cancelled

  8. Emergency Violations continued… • If the 2 consecutive days include a weekend, a Supervisor will contact both parties by phone; and a final physical inspection will be conducted on the next business day. • If the repairs are not completed, Housing Assistance Payments will be abated. • If additional time is needed to complete repairs, you must obtain approval from the HCVP otherwise, the contract will be cancelled

  9. Emergency Violations continued… If the items are deemed tenant responsibility and repairs are not corrected within 2 consecutive days, the tenant will be proposed for termination with the possibility of permanently losing their subsidy.

  10. HQS Acceptability Requirements • Units with windows that are designed to be open must be operable and must have screens and storms on all exterior windows of the unit, unless the unit is located in a building that has a total HVAC system and does not require windows that can be opened for fresh air.

  11. HQS Acceptability Req. cont… • If a clothes dryer is present in a dwelling unit, the dryer must be vented to the outside of the unit. • The dwelling unit must have storm doors on exterior entrance doors to the unit.  Exceptions may be made for multi-family units and historical preservation.

  12. HQS Acceptability Req. cont… • Sanitary/Lavatory facilities must be in a separate, private room; must have a • Toilet and a fixed wash basin, both in working condition • A shower or tub and cold and hot running water • Utilize a public or private disposal system • Means of ventilation • Located such that access does not have to be solely through a bedroom.

  13. HQS Acceptability Req. cont… • Exterior doors must be lockable with a turn style deadbolt on the inside. • Dwelling units must have working downspouts, working gutters if present. • NO defective paint, i.e. chipping, peeling, damaged paint regardless if a child under 6yrs old is present in the home or not.

  14. Initial Inspections: Timeline • Metro Inspections, LLC is conducting all initial/ movers inspections • Once an RFTA is submitted, Metro contacts the landlord within 24hrs with an inspection date, 7-10 business days after the submission of the RFTA • ONLY 2 inspections are conducted on an initial/movers • Re-inspections will be scheduled within 7-14 days after the 1st failed inspection

  15. Annual Inspections: Timeline 1st Inspection • Inspector will direct landlord to the Landlord Portal for results. The Landlord will be given 30 days to correct violations 2nd Inspection, 30 Days after 1st inspection • If all violations are not corrected , HAP will be abated on the 1st day of the following month. 3rd Inspection, 30 Days after 2nd inspection • Final inspection, if all violations are not corrected, the HAP contract will be cancelled at the end of the month

  16. The 3 R’s REPAIR REPLACE REMOVE

  17. LEAD LAW: Citation • Cited for defective paint AND • Child under 6 yrs old in the home AND • Home built prior to January 1, 1978

  18. Lead Law, continued… Once Cited: • Owner has 10 days from initial move-in inspection or 29 days from an annual inspection to provide proper documentation • Meeting lead-based paint requirements is located at www.cmha.net/hcvp/docs/MeetingLeadBasedPaintRequirements.pdf • All other inspections violations must be corrected during this time period

  19. Lead Law, continued… LEAD SAFE WORK PRACTICE LEAD-BASED PAINT CONTRACTOR CERTIFICATION FORM PASSED LEAD CLEARANCE TEST COMPLIANCE Documentation must be emailed to hcvplead@cmha.net or hand delivered to the HCVP office at 8120 Kinsman Rd, Resource Room #107

  20. Weather Deferral Annual Inspection: Oct.15th-Apr.15th Weather deferrals are ACCEPTED through HCVP or the City. All items must be corrected during the extended time given and the unit must pass the inspection or the unit goes into abatement for a 2nd fail. Initial/Movers Inspection: NO weather deferrals. Even if the City provides a landlord with a weather deferral, HCVP cannot go under contract until all items are corrected.

  21. Building Quality Rating • Excellent Rating: • If building was constructed NEW 2008 or later

  22. Building Quality Rating continued… • Above Average Rating: • If the building was constructed new 2003-2007 OR if the building was substantially rehabbed 2008-2012 • With at least a comprehensive kitchen and bathroom renovation (cabinets, wiring, floors, and appliances) • Inspectors must have a copy of all pertient work receipts and permits to justify qualifications for the unit condition

  23. Building Quality Rating continued… • Work receipts and permits must be shown at the time of the inspection. • Credit will not be given without the APPROVAL of the Inspections Manager • Once approved, the unit’s Quality Rating can be increased • For the Building Quality Rating criteria, please visit www.cmha.net/hcvp/docs/BuildingQualityRatingProcedure.pdf

  24. Resolving Municipal Requirements Contact the building department in the municipality your unit is in, to receive information on all paperwork, fees, and inspections that the city may require for a unit to qualify as a rental property. Remember: If your unit is not in compliance with the City, the unit is not in compliance with the HCVP

  25. City Extensions and Deferrals • Always communicate and provide proper documentation when given an extension or deferral for weather or major repairs • The paperwork should always be mailed to HCVP; Attention: Samantha Stewart or scan and email via the Landlord Portal by selecting the Ombudsman office

  26. Extensions for Re-Inspections • All extension requests should be sent through the Landlord Portal, www.cmha.net/llportal, if assistance is needed, call Customer Service at 216-431-1471 • Request must be made 5 days prior to the original inspection date

  27. Resource Room Inspection: • Available M-F 8am-5pm • Ask General questions

  28. Landlord Portal • Change owner’s personal information • View all inspection results within 48hrs • Obtain detailed list of failed items • View all HAP payments • View changes to the tenant’s rent portion

  29. Landlord Portal continued • Link to ALL publications, forms, and newsletters • Submit inquiries • Submit extension request • Sign up for Email Blast and text message notification

  30. QUESTIONS

More Related