html5-img
1 / 7

Exchange project 2013

Exchange project 2013. Install and configure Microsoft server 2008R2 F.Berben@roc-teraa.nl. Basic setting:. The Transport company 10C needs a new IT infrastructure. Headquarters in Son Second location Zary Poland The two locations are Connected via VPN.

ziazan
Télécharger la présentation

Exchange project 2013

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Exchange project 2013 Install and configure Microsoft server 2008R2 F.Berben@roc-teraa.nl

  2. Basic setting: • The Transport company 10C needs a new IT infrastructure. • Headquarters in Son • Second location Zary Poland • The two locations are Connected via VPN. • The company would like an Own mail server in Holland and a SharePoint (Foundation) server

  3. Vision: Client First •   Customer satisfaction, this is where it’s all about at 10C. That also applies for partnership. No short- term investments but long-established relationships. Thus we are proud to have the opportunity to work for leading companies around the world. • 10C has its origin in a family company in southern Netherlands, established in 1923. Decisive and with a pleasant atmosphere and informal culture. • The Name 10C is based on the fact that it was the first company to have a trailer for 10 cows.

  4. Deliverables • 1. Plan for the next 3 weeks • 2. Functional design • 3. Technical design • 4. Implementation and test • 5. Presentation of the project.

  5. Company overview Holland Poland • CEO:                     D. Doc M. Mędrek • HRM                       G. Giechel W. Wesołek • CFO:     G. Grumpie G. Gburek • Sales             D. Dommel S. Śpioszek • Warehouse           N. Niezel A. Apsik • ICT Bashful  B. Bloosje N. Nieśmiałek • Logistics        S. StoetelG. Gapcio • Development W. Wortel

  6. Specific requirements: • Implement A/D all users except Development can log-in everywhere. • Development has personalized computers • Automatic language switch based on user • Automatics background switch based one language and location

  7. Questions?