An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Cobb County Department of Transportation Brook Martin Operations Division

  2. SCATS System • First Adaptive System in Georgia • Cumberland CID Area • I-75/I-285 Interchange • 73 Intersections along 8 Corridors • 332 Cabinets & 2070L Controllers • Single Mode Fiber Communication • Video Detection

  3. SCATS Cost • Total Project - $3.7 Million • Video Detection - 40% ($22k per intersection) • SCATS - 30% ($15k per intersection) • Signal Equipment/Fiber - 30%

  4. SCATS Operation • 24-Hour Coordinated System • Cycle Lengths, Offsets and Splits • Min/Max Ranges • Triggers for Lead/Lag Operation • Railroad Pre-Emption Operation • Double Cycle • Group Systems

  5. SCATS Special Events • Cobb Galleria • 30% Traffic Volume Increase • Cobb Energy Performing Arts Center • 80% Traffic Volume Increase • Cumberland Mall • Seasonal Shopping • Summer/Holidays • Traffic Demand Reduction

  6. SCATS Features • Traffic Data Collection • Average Daily Traffic Volumes • Turning Movement Counts • Monitoring Capability • Daily Operation • Daily Maintenance

  7. SCATS Benefits • Reduced Delay/Travel Times • Eliminates Retiming Projects • Stable Software • Good Support • Few Complaints

  8. SCATS Requirements • Staff Adjustment Period • Signal Maintenance Program • Equipment • Cabinet Relays • Communication

  9. SCATS Future Projects • Town Center CID Area • 75 Intersections • I-75 Corridor • Communication • Video Detection

  10. Questions?